North Portland Bible College

Industrial

Multnomah County, Oregon · WECC

DC Readiness
55.9
Good / 100

At a glance

North Portland Bible College is an industrial datacenter candidate site in Multnomah County, Oregon, scoring 55.9/100 DC Readiness — 157th of 234 scored sites in the county. It sits in the WECC grid region and the PORTLAND GENERAL ELECTRIC CO service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityPORTLAND GENERAL ELECTRIC COinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPH5 Data Centers Portland (OR01)
IXP distance2.0 mi
Fiber providers10
Fiber coverage80.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterH5 Data Centers Portland (OR01)
DC distance2.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity7.88¢/kWh
Industrial electricity5.02¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$27,472

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track North Portland Bible College

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does North Portland Bible College compare with other sites in Multnomah County?

North Portland Bible College ranks 157th of 234 scored candidate sites in Multnomah County. Its 55.9/100 is roughly in line with the county average of 58.5. It is roughly in line with the Oregon average of 53.1 and roughly in line with the national average of 53.2.

Against the Oregon average, its strongest sub-score is fiber connectivity (95 vs 66) and its weakest is power availability (30 vs 40). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is North Portland Bible College to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is H5 Data Centers Portland (OR01) at 2 miles. 10 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is H5 Data Centers Portland (OR01), 2 miles away.

What are the flood, water and hazard risks at North Portland Bible College?

At the county level, FEMA's National Risk Index rates Multnomah County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
95
Energy cost10%
50
Water risk7%
60
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Multnomah County, ranked by DC Readiness.

Sites near North Portland Bible College
SiteTypeVoltageCapacityQueue waitScore
BPA TROUTDALESubstation-Adjacent500 kV1,000 MW3.5 yrs69.7
OSTRANDERSubstation-Adjacent500 kV1,000 MW3.5 yrs68.7
CARVERSubstation-Adjacent230 kV300 MW3.5 yrs66.3
BLUE LAKESubstation-Adjacent230 kV300 MW3.5 yrs66.2
GRESHAMSubstation-Adjacent230 kV300 MW3.5 yrs66.1
MCLOUGHLINSubstation-Adjacent230 kV300 MW3.5 yrs64.9
TAP203170Substation-Adjacent230 kV300 MW3.5 yrs64.6
OZ MultnomahGreenfield——3.5 yrs64.4

North Portland Bible College: common questions

What is the DC Readiness score of North Portland Bible College?

North Portland Bible College scores 55.9/100 on the GridCensus DC Readiness scale, rated good. It ranks 157th of 234 scored sites in Multnomah County. The Multnomah County average is 58.5 and the Oregon average is 53.1.

Which electric utility serves North Portland Bible College?

PORTLAND GENERAL ELECTRIC CO (investor owned) holds the retail service territory that contains the site.

What grid region is North Portland Bible College in?

North Portland Bible College is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is North Portland Bible College from an internet exchange?

The nearest internet exchange facility is H5 Data Centers Portland (OR01), about 2 miles away; 10 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “North Portland Bible College, Multnomah County, OR”, https://gridcensus.com/datacenter-sites/oregon/multnomah-county/north-portland-bible-college-5ee9e0e1 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for North Portland Bible College, Multnomah County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.