DB Anderson Bulk Plant

Industrial

Malheur County, Oregon · WECC

DC Readiness
40.1
Fair / 100

DB Anderson Bulk Plant is a industrial datacenter candidate site in Malheur County, Oregon, interconnecting through WECC. It screens at 40.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPTonaquint Data Center - Boise ID
IXP distance43.7 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterTonaquint Data Center - Boise ID
DC distance43.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.76¢/kWh
Industrial electricity8.50¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$1,851

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Malheur County, ranked by DC Readiness.

Sites near DB Anderson Bulk Plant
SiteTypeVoltageCapacityQueue waitScore
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs61.5
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs61.5
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs60.7
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs59.9
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs59.0
Greenfield (BURNS - HEMINGWAY)Greenfield500 kV1,000 MW1.7 yrs58.9
TAP207196Substation-Adjacent115 kV100 MW1.7 yrs57.3
JUNTURASubstation-Adjacent115 kV100 MW1.7 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DB Anderson Bulk Plant, Malheur County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.