Copper Dam Plant is a brownfield datacenter candidate site in Hood River County, Oregon, interconnecting through WECC. It screens at 58.9/100 DC Readiness with a catalogued 3 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationHOOD RIVER
Substation distance1.6 mi
Substation voltage115 kV
Available capacity3 MW
Utility commercial rate0.06¢/kWh
UtilityHOOD RIVER ELECTRIC COOPnot available

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionWECC
Queue depth34
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPGRHMORXB - Gresham Central Office
IXP distance45.2 mi
Fiber providers7
Fiber coverage68.4%
Nearest cloud providerAWS
Nearest cloud regionus-west-2
Cloud region distance30.9 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability20.0/100
Land cover (NLCD)Emergent Herbaceous Wetlands
Former usehydro
Existing capacity3 MW
Retirement date2015-06-01

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone X
Water stress (WRI)2.00
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index77.4 (avg 100)

Location context

Nearest datacenterGoogle
DC distance15.5 mi
Nearest rail0.7 mi
Nearest gas pipeline4.1 mi
Nearest fiber route67.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity6.15¢/kWh
Industrial electricity6.62¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$19,141

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Copper Dam Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
34
Speed to power20%
54
Fiber connectivity12%
69
Energy cost10%
94
Water risk7%
69
Natural hazard6%
58
Buildability7%
20
Labor market4%
50
DC cluster4%
95
Land / acreage3%
60
Construction cost3%
86
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Hood River County, ranked by DC Readiness.

Sites near Copper Dam Plant
SiteTypeVoltageCapacityQueue waitScore
TAP209082Substation-Adjacent230 kV300 MW6.9 yrs64.4
NORTH BONNEVILLESubstation-Adjacent230 kV300 MW6.9 yrs63.4
DEAD HEADSubstation-Adjacent230 kV300 MW6.9 yrs62.6
TAP205756Substation-Adjacent115 kV100 MW6.9 yrs60.0
THE DALLESSubstation-Adjacent115 kV100 MW6.9 yrs60.0
TAP209080Substation-Adjacent115 kV100 MW6.9 yrs59.9
UNKNOWN203177Substation-Adjacent115 kV100 MW6.9 yrs59.9
BINGENSubstation-Adjacent115 kV100 MW6.9 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Copper Dam Plant, Hood River County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.