Former Monroe Gas Station

Industrial

Benton County, Oregon · WECC

DC Readiness
51.4
Fair / 100

At a glance

Former Monroe Gas Station is an industrial datacenter candidate site in Benton County, Oregon, scoring 51.4/100 DC Readiness — 64th of 66 scored sites in the county. It sits in the WECC grid region and the CONSUMERS POWER, INC service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityCONSUMERS POWER, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPPeak Internet
IXP distance16.9 mi
Fiber providers10
Fiber coverage32.3%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterPeak Internet
DC distance16.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.41¢/kWh
Industrial electricity7.37¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$12,931

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Monroe Gas Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Monroe Gas Station compare with other sites in Benton County?

Former Monroe Gas Station ranks 64th of 66 scored candidate sites in Benton County. Its 51.4/100 is roughly in line with the county average of 56.6. It is roughly in line with the Oregon average of 53.1 and roughly in line with the national average of 53.2.

Against the Oregon average, its strongest sub-score is fiber connectivity (71 vs 66) and its weakest is power availability (30 vs 40). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Monroe Gas Station to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Peak Internet at 16.9 miles. 10 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Peak Internet, 16.9 miles away.

What are the flood, water and hazard risks at Former Monroe Gas Station?

At the county level, FEMA's National Risk Index rates Benton County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
60
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Benton County, ranked by DC Readiness.

Sites near Former Monroe Gas Station
SiteTypeVoltageCapacityQueue waitScore
WRENSubstation-Adjacent230 kV300 MW3.5 yrs63.4
ALBANYSubstation-Adjacent230 kV300 MW3.5 yrs63.3
FRYSubstation-Adjacent230 kV300 MW3.5 yrs63.0
Corvallis Municipal AirportBrownfield—0 MW3.5 yrs62.9
CALAPOOYASubstation-Adjacent230 kV300 MW3.5 yrs61.3
TAP207025Substation-Adjacent132 kV100 MW3.5 yrs60.6
BUCHANANSubstation-Adjacent115 kV100 MW3.5 yrs60.5
GRANT STREETSubstation-Adjacent115 kV100 MW3.5 yrs60.4

Former Monroe Gas Station: common questions

What is the DC Readiness score of Former Monroe Gas Station?

Former Monroe Gas Station scores 51.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 64th of 66 scored sites in Benton County. The Benton County average is 56.6 and the Oregon average is 53.1.

Which electric utility serves Former Monroe Gas Station?

CONSUMERS POWER, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Former Monroe Gas Station in?

Former Monroe Gas Station is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is Former Monroe Gas Station from an internet exchange?

The nearest internet exchange facility is Peak Internet, about 16.9 miles away; 10 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Monroe Gas Station, Benton County, OR”, https://gridcensus.com/datacenter-sites/oregon/benton-county/former-monroe-gas-station-cbbffbb1 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Monroe Gas Station, Benton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.