Skip to content
Gridcensus

BAKER PROJECT, LOWER DIVISION

Federal Excess

Baker County, Oregon · WECC

DC Readiness
49.7
Fair / 100

BAKER PROJECT, LOWER DIVISION is a federal excess datacenter candidate site in Baker County, Oregon, interconnecting through WECC. It screens at 49.7/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPKNWCWAXA - Kennewick Central Office
IXP distance105.7 mi
Fiber providers11
Fiber coverage67.9%

Site characteristics

Acreage40 ac
Land contactBaker County County Assessor
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterAmazon Web Services
DC distance89.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.61¢/kWh
Industrial electricity7.40¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$1,942

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
67
Energy cost10%
50
Water risk8%
60
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Baker County, ranked by DC Readiness.

Sites near BAKER PROJECT, LOWER DIVISION
SiteTypeVoltageCapacityQueue waitScore
OZ BakerGreenfield1.7 yrs58.0
TAP205307Substation-Adjacent230 kV300 MW6.9 yrs56.5
QUARTZSubstation-Adjacent230 kV300 MW6.9 yrs56.5
UNKNOWN202611Substation-Adjacent138 kV100 MW6.9 yrs52.5
COW VALLEYSubstation-Adjacent115 kV100 MW6.9 yrs52.2
UNITYSubstation-Adjacent115 kV100 MW6.9 yrs52.2
ELM STREETSubstation-Adjacent115 kV100 MW6.9 yrs52.2
UNKNOWN202818Substation-Adjacent115 kV100 MW6.9 yrs52.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BAKER PROJECT, LOWER DIVISION, Baker County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.