Gridcensus

UNKNOWN118333

Substation-Adjacent

Woodward County, Oklahoma · SPP

DC Readiness
54.9
Fair / 100

UNKNOWN118333 is a substation-adjacent datacenter candidate site in Woodward County, Oklahoma, interconnecting through SPP. It screens at 54.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN118333
Nearest grid bottleneckTP1241_33286 · 139 km (SPP)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityNORTHWESTERN ELECTRIC COOP INC - (OK)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidcon Recovery Solutions B3 Data Center
IXP distance116.8 mi
Fiber providers1
Fiber coverage83.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterSC DC
DC distance62.6 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.80¢/kWh
Industrial electricity6.43¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$1,481

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN118333

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Woodward County, ranked by DC Readiness.

Sites near UNKNOWN118333
SiteTypeVoltageCapacityQueue waitScore
WOODWARDSubstation-Adjacent345 kV600 MW3.3 yrs60.9
EC Near WoodwardGreenfield——3.5 yrs60.8
UNKNOWN173369Substation-Adjacent345 kV600 MW3.3 yrs60.1
EC Near WoodwardGreenfield——3.5 yrs59.2
EC Near WoodwardGreenfield——3.5 yrs59.0
EC Near WoodwardGreenfield——3.5 yrs59.0
EC Near WoodwardGreenfield——3.5 yrs58.7
EC Near WoodwardGreenfield——3.5 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN118333, Woodward County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.