EC Near Enid

Greenfield

Garfield, Oklahoma · SPP

DC Readiness
61.8
Good / 100

EC Near Enid is a greenfield datacenter candidate site in Garfield, Oklahoma, interconnecting through SPP. It screens at 61.8/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTMP270_23432 · 126 km (SPP)
LMP zoneSPP_SOUTH
Wholesale LMP$15.62/MWh
Utility commercial rate0.11¢/kWh
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPMidcon Recovery Solutions B3 Data Center
IXP distance57.7 mi
Fiber providers6
Fiber coverage82.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance258.8 mi

Site characteristics

Site typeGreenfield
Land contactGarfield County Assessor
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usenear retired gas plant (5km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteLYLES PAINT BODY SHOP
Hazard sub-score48/100
Construction cost index82.2 (avg 100)

Location context

Nearest datacenterMidcon Recovery Solutions B3 Data Center
DC distance57.7 mi
Nearest rail0.3 mi
Nearest gas pipeline1.4 mi
Nearest fiber route42.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.64¢/kWh
Industrial electricity6.51¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,072

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Enid

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
73
Energy cost10%
96
Water risk7%
73
Natural hazard6%
48
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
67
Construction cost3%
82
Gas pipeline2%
96
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Garfield, ranked by DC Readiness.

Sites near EC Near Enid
SiteTypeVoltageCapacityQueue waitScore
WOODRINGSubstation-Adjacent345 kV600 MW3.3 yrs62.4
EC Near EnidGreenfield3.5 yrs61.6
UNKNOWN118692Substation-Adjacent345 kV600 MW3.3 yrs61.2
EC Near EnidGreenfield3.5 yrs60.7
EC Near EnidGreenfield3.5 yrs59.9
EC Near EnidGreenfield3.5 yrs59.9
EC Near EnidGreenfield3.5 yrs59.7
EC Near EnidGreenfield3.5 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Enid, Garfield. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.