WASHITA BASIN PROJECT

Federal Excess

Custer County, Oklahoma · SPP

DC Readiness
40.7
Fair / 100

WASHITA BASIN PROJECT is a federal excess datacenter candidate site in Custer County, Oklahoma, interconnecting through SPP. It screens at 40.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth87

Connectivity

Nearest IXPRACK59 Data Center
IXP distance86.3 mi

Site characteristics

Acreage40 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterRack59 Data Center
DC distance86.2 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.62¢/kWh
Industrial electricity6.10¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$1,869

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
36
Fiber connectivity12%
50
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Custer County, ranked by DC Readiness.

Sites near WASHITA BASIN PROJECT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN168533Substation-Adjacent138 kV100 MW3.4 yrs66.8
TAP168534Substation-Adjacent138 kV100 MW3.4 yrs66.7
UNKNOWN118423Substation-Adjacent138 kV100 MW3.4 yrs66.6
TAP175808Substation-Adjacent138 kV100 MW3.4 yrs65.7
TAP149222Substation-Adjacent138 kV100 MW3.4 yrs65.5
UNKNOWN118827Substation-Adjacent138 kV100 MW3.4 yrs65.5
TAP168529Substation-Adjacent138 kV100 MW3.4 yrs65.4
UNKNOWN118811Substation-Adjacent138 kV100 MW3.4 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.