Skip to content
Gridcensus

Datacenter Sites in Surry, North Carolina

Surry has 14 scored datacenter candidate sites averaging 50.7/100 DC Readiness, with a catalogued aggregate of 450 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

14
Candidate sites
50.7/100
Avg DC Readiness
450 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in Surry

Site-selection context for Surry

Yessales_tax_exemption
Datacenter tax incentive
10.84¢/kWh
Commercial electricity
10.45¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$6,529
Land price / acre
1,600
Cooling degree days
3,300
Heating degree days
59°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

By site type

Top datacenter sites in Surry

Top datacenter sites in Surry
SiteTypeVoltageCapacityQueue waitScore
OZ SurryGreenfield——4.3 yrs53.4
UNKNOWN110809Substation-Adjacent100 kV50 MW3.8 yrs52.5
UNKNOWN110804Substation-Adjacent100 kV50 MW3.8 yrs52.3
UNKNOWN111322Substation-Adjacent100 kV50 MW3.8 yrs51.9
UNKNOWN111323Substation-Adjacent100 kV50 MW3.8 yrs51.8
UNKNOWN111326Substation-Adjacent100 kV50 MW3.8 yrs51.8
TAP150382Substation-Adjacent100 kV50 MW3.8 yrs51.8
UNKNOWN111325Substation-Adjacent100 kV50 MW3.8 yrs51.8
UNKNOWN110802Substation-Adjacent100 kV50 MW3.8 yrs51.7
UNKNOWN110798Substation-Adjacent100 kV50 MW3.8 yrs51.7
Spencer's PropertiesIndustrial——3.8 yrs47.4
Spencer's MillIndustrial——3.8 yrs47.4
Mine SiteFormer Mine——3.8 yrs47.3
Mine SiteFormer Mine——3.8 yrs47.3

Surry datacenter FAQ

How many datacenter sites are in Surry?
14 scored datacenter candidate sites, averaging 50.7/100 DC Readiness.
Does Surry offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.
What is the natural-hazard risk in Surry?
FEMA's National Risk Index rates Surry as "Relatively High" (score 42).
What are industrial electricity rates in Surry?
Average industrial electricity is 10.45¢/kWh and commercial is 10.84¢/kWh in Surry.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Surry, North Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.