Skip to content
Gridcensus

Datacenter Sites in Burke, North Carolina

Burke has 28 scored datacenter candidate sites averaging 58.0/100 DC Readiness, with a catalogued aggregate of 2,000 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

28
Candidate sites
58.0/100
Avg DC Readiness
2,000 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 24 in Burke

Site-selection context for Burke

Yessales_tax_exemption
Datacenter tax incentive
10.90¢/kWh
Commercial electricity
7.74¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$6,651
Land price / acre
1,600
Cooling degree days
3,300
Heating degree days
59°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

By site type

Top datacenter sites in Burke

Top datacenter sites in Burke
SiteTypeVoltageCapacityQueue waitScore
EC Near Water Filter Plant #2Greenfield4.3 yrs55.4
EC Near Water Filter Plant #2Greenfield4.3 yrs54.7
EC Near Water Filter Plant #2Greenfield4.3 yrs54.6
OZ BurkeGreenfield4.3 yrs53.8
UNKNOWN110395Substation-Adjacent100 kV50 MW3.8 yrs53.4
UNKNOWN110535Substation-Adjacent100 kV50 MW3.8 yrs53.4
EC Near Water Filter Plant #2Greenfield4.3 yrs52.9
UNKNOWN110398Substation-Adjacent100 kV50 MW3.8 yrs52.9
UNKNOWN110537Substation-Adjacent100 kV50 MW3.8 yrs52.8
UNKNOWN110536Substation-Adjacent100 kV50 MW3.8 yrs52.6
EC Near Water Filter Plant #2Greenfield4.3 yrs51.9
TAP153158Substation-Adjacent100 kV50 MW3.8 yrs51.6
UNKNOWN110534Substation-Adjacent100 kV50 MW3.8 yrs51.6
TAP153934Substation-Adjacent100 kV50 MW3.8 yrs51.1
Hollar Mobile Home ParkIndustrial3.8 yrs51.0
Hickory Airport LandfillIndustrial3.8 yrs51.0
Doblin MastercraftIndustrial3.8 yrs51.0
UNKNOWN110533Substation-Adjacent100 kV50 MW3.8 yrs50.9
TAP169558Substation-Adjacent100 kV50 MW3.8 yrs50.9
UNKNOWN110532Substation-Adjacent100 kV50 MW3.8 yrs50.9
EC Near Water Filter Plant #2Greenfield4.3 yrs50.4
Drexel 1Industrial3.8 yrs49.1
Former Drexel Heritage Furniture 3 & 5Industrial3.8 yrs48.8
Mine SiteFormer Mine3.8 yrs48.3

Burke datacenter FAQ

How many datacenter sites are in Burke?
28 scored datacenter candidate sites, averaging 58.0/100 DC Readiness.
Does Burke offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.
What is the natural-hazard risk in Burke?
FEMA's National Risk Index rates Burke as "Relatively High" (score 42).
What are industrial electricity rates in Burke?
Average industrial electricity is 7.74¢/kWh and commercial is 10.90¢/kWh in Burke.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Burke, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.