Greenfield (UNKNOWN124253 - UNKNOWN124830)

Greenfield

Yates, New York · NYISO

DC Readiness
48.2
Fair / 100

Greenfield (UNKNOWN124253 - UNKNOWN124830) is a greenfield datacenter candidate site in Yates, New York, interconnecting through NYISO. It screens at 48.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN124253
Substation voltage115 kV
Available capacity100 MW
UtilityNEW YORK STATE ELEC & GAS CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPRochester Colo
IXP distance32.3 mi
Fiber providers5
Fiber coverage55.1%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterGreenidge Power Plant and Data Center
DC distance16.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.96¢/kWh
Industrial electricity7.47¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$6,402

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN124253 - UNKNOWN124830)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
38
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Yates, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN124253 - UNKNOWN124830)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124194Substation-Adjacent115 kV100 MW4.9 yrs58.5
EC Near Greenidge Generation LLCGreenfield3.5 yrs58.1
UNKNOWN124830Substation-Adjacent115 kV100 MW4.9 yrs56.2
EC Near Greenidge Generation LLCGreenfield3.5 yrs56.2
EC Near Greenidge Generation LLCGreenfield3.5 yrs55.5
UNKNOWN124253Substation-Adjacent115 kV100 MW4.9 yrs55.2
EC Near Greenidge Generation LLCGreenfield3.5 yrs55.0
EC Near Greenidge Generation LLCGreenfield3.5 yrs54.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN124253 - UNKNOWN124830), Yates. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.