OZ Warren

Greenfield

Warren County, New York · NYISO

DC Readiness
52.9
Fair / 100

OZ Warren is a greenfield datacenter candidate site in Warren County, New York, interconnecting through NYISO. It screens at 52.9/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneNYISO_CAPITL
Wholesale LMP$59.21/MWh
Utility commercial rate0.07¢/kWh
UtilityNIAGARA MOHAWK POWER CORP.investor ownedmoderate to large load · terms ≥ 20 MW

Speed to power

Interconnection outlookConstrained
≈ 3.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPTurnKey Internet
IXP distance39.2 mi
Fiber providers5
Fiber coverage22.7%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance355.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerMacDuff, Eva
Land contactWarren County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteDOHENY OIL
Hazard sub-score55/100
Construction cost index91.8 (avg 100)

Location context

Nearest datacenterTurnkey Internet
DC distance39.2 mi
Nearest rail1.1 mi
Nearest gas pipeline38.4 mi
Nearest fiber route20.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.42¢/kWh
Industrial electricity3.98¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$6,662

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Warren

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
39
Fiber connectivity12%
56
Energy cost10%
67
Water risk7%
93
Natural hazard6%
55
Buildability7%
92
Labor market4%
50
DC cluster4%
40
Land / acreage3%
56
Construction cost3%
74
Gas pipeline2%
0
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near OZ Warren
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN127714Substation-Adjacent115 kV100 MW4.9 yrs53.5
UNKNOWN127716Substation-Adjacent115 kV100 MW4.9 yrs53.2
FLOYD BENNETT MEMORIAL AIRPORTFederal Excess——3.3 yrs50.8
OZ WarrenGreenfield——3.5 yrs49.3
4 Grand StreetIndustrial——4.9 yrs47.7
Mine SiteFormer Mine——4.9 yrs47.7
237 RidgeIndustrial——4.9 yrs47.7
Former National Guard ArmoryIndustrial——4.9 yrs47.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Warren, Warren County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.