DC Readiness
54.3
Fair / 100

OZ Tioga is a greenfield datacenter candidate site in Tioga County, New York, interconnecting through NYISO. It screens at 54.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneNYISO_CAPITL
Wholesale LMP$55.47/MWh
Utility commercial rate0.10¢/kWh
UtilityNEW YORK STATE ELEC & GAS CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 3.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXP70 Henry St
IXP distance30.2 mi
Fiber providers9
Fiber coverage53.8%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance219.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerSchmeltz Francis L
Land contactTioga County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index77.1 (avg 100)

Location context

Nearest datacenter70 Henry St
DC distance30.2 mi
Nearest rail2.1 mi
Nearest gas pipeline1.1 mi
Nearest fiber route125.0 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.68¢/kWh
Industrial electricity7.06¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$2,865

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Tioga

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
25
Fiber connectivity12%
65
Energy cost10%
69
Water risk7%
92
Natural hazard6%
65
Buildability7%
45
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
86
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Tioga County, ranked by DC Readiness.

Sites near OZ Tioga
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN141327Substation-Adjacent230 kV300 MW4.9 yrs61.0
CASTLE GARDENSSubstation-Adjacent115 kV100 MW4.9 yrs58.3
UNKNOWN124661Substation-Adjacent115 kV100 MW4.9 yrs58.2
BINGHAMTON VORFederal Excess——3.3 yrs56.9
UNKNOWN124642Substation-Adjacent115 kV100 MW4.9 yrs56.6
EC FFE Tioga CountyGreenfield——3.5 yrs56.3
TAP173592Substation-Adjacent115 kV100 MW4.9 yrs56.3
UNKNOWN144975Substation-Adjacent115 kV100 MW4.9 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Tioga, Tioga County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.