NISA Electric Generation Project

Brownfield

New York County, New York · NYISO

DC Readiness
53.0
Fair / 100

NISA Electric Generation Project is a brownfield datacenter candidate site in New York County, New York, interconnecting through NYISO. It screens at 53.0/100 DC Readiness with a catalogued 93 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Available capacity93 MW
LMP zoneNYISO_NYC
Wholesale LMP$60.74/MWh
Utility commercial rate0.20¢/kWh
UtilityCONSOLIDATED EDISON CO-NY INCinvestor ownedrestrictive to large load · terms ≥ 20 MWStandby / large-load service; NYISO Zone J

Speed to power

Interconnection outlookConstrained
≈ 3.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXP375 Pearl, Intergate.Manhattan
IXP distance1.7 mi
Fiber providers18
Fiber coverage99.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance219.0 mi

Site characteristics

Site typeBrownfield
Parcel ownerNYC Energy LLC
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usegas
Existing capacity93 MW

Risk & environment

Environmental constraintHigh (70/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteABEX CORP SIGNAL STAT DIVISION
Hazard sub-score30/100
Construction cost index161.3 (avg 100)

Location context

Nearest datacenter375 Pearl, Intergate.Manhattan
DC distance1.7 mi
Nearest rail0.3 mi
Nearest gas pipeline0.8 mi
Nearest fiber route107.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity19.58¢/kWh
Industrial electricity27.43¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$59,992

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NISA Electric Generation Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
34
Speed to power20%
29
Fiber connectivity12%
97
Energy cost10%
58
Water risk7%
90
Natural hazard6%
30
Buildability7%
5
Labor market4%
50
DC cluster4%
100
Land / acreage3%
72
Construction cost3%
16
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in New York County, ranked by DC Readiness.

Sites near NISA Electric Generation Project
SiteTypeVoltageCapacityQueue waitScore
RAINEYSubstation-Adjacent345 kV600 MW4.9 yrs71.7
Charles PolettiBrownfield138 kV883 MW4.9 yrs70.4
BERGENSubstation-Adjacent345 kV600 MW3.8 yrs69.8
FARRAGUTSubstation-Adjacent345 kV600 MW4.9 yrs69.6
EAST 13TH STREETSubstation-Adjacent345 kV600 MW4.9 yrs68.8
NORTH BERGENSubstation-Adjacent345 kV600 MW3.8 yrs68.7
HOMESTEADSubstation-Adjacent345 kV600 MW3.8 yrs68.6
WEST 49TH STREETSubstation-Adjacent345 kV600 MW4.9 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for NISA Electric Generation Project, New York County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.