Madison County Landfill (Canastota)

Brownfield

Madison County, New York · NYISO

DC Readiness
58.9
Good / 100

Madison County Landfill (Canastota) is a brownfield datacenter candidate site in Madison County, New York, interconnecting through NYISO. It screens at 58.9/100 DC Readiness with a catalogued 0 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPETERBORO
Substation distance0.8 mi
Substation voltage115 kV
Available capacity0 MW
LMP zoneNYISO_ZONE_C
Wholesale LMP$36.80/MWh
Utility commercial rate0.09¢/kWh
UtilityNIAGARA MOHAWK POWER CORP.investor ownedmoderate to large load · terms ≥ 20 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPLightboard ★ Western NY
IXP distance20.0 mi
Fiber providers9
Fiber coverage30.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance293.3 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity0 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCANASTOTA CENTRAL SCHOOL
Hazard sub-score55/100
Construction cost index87.3 (avg 100)

Location context

Nearest datacenterSU Green Data Center
DC distance18.8 mi
Nearest rail0.5 mi
Nearest gas pipeline6.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.85¢/kWh
Industrial electricity5.93¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,841

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Madison County Landfill (Canastota)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
38
Speed to power20%
40
Fiber connectivity12%
62
Energy cost10%
89
Water risk7%
93
Natural hazard6%
55
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
57
Construction cost3%
77
Gas pipeline2%
80
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Madison County, ranked by DC Readiness.

Sites near Madison County Landfill (Canastota)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN127513Substation-Adjacent115 kV100 MW4.9 yrs56.9
ONEIDASubstation-Adjacent115 kV100 MW4.9 yrs55.7
TAP140356Substation-Adjacent115 kV100 MW4.9 yrs55.7
UNKNOWN125598Substation-Adjacent115 kV100 MW4.9 yrs55.7
PETERBOROSubstation-Adjacent115 kV100 MW4.9 yrs55.6
TAP139303Substation-Adjacent115 kV100 MW4.9 yrs55.2
FENNERSubstation-Adjacent115 kV100 MW4.9 yrs55.1
TAP139300Substation-Adjacent115 kV100 MW4.9 yrs55.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Madison County Landfill (Canastota), Madison County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.