Skip to content
Gridcensus

Greenfield (BROWNSVILLE - AURORA)

Greenfield

Haywood County, New York · NYISO

DC Readiness
56.1
Good / 100

Greenfield (BROWNSVILLE - AURORA) is a greenfield datacenter candidate site in Haywood County, New York, interconnecting through NYISO. It screens at 56.1/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBROWNSVILLE
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPDataBank Memphis (MEM1)
IXP distance36.4 mi
Fiber providers5
Fiber coverage58.9%

Site characteristics

Site typeGreenfield
Land contactHaywood County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterDataBank Memphis (MEM1)
DC distance36.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.10¢/kWh
Industrial electricity8.53¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$3,625

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (BROWNSVILLE - AURORA)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
25
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Haywood County, ranked by DC Readiness.

Sites near Greenfield (BROWNSVILLE - AURORA)
SiteTypeVoltageCapacityQueue waitScore
BROWNSVILLESubstation-Adjacent500 kV1,000 MW1.0 yrs69.8
LAGOON CREEKSubstation-Adjacent500 kV1,000 MW1.0 yrs69.4
UNKNOWN115425Substation-Adjacent161 kV100 MW1.0 yrs62.1
UNKNOWN159911Substation-Adjacent161 kV100 MW1.0 yrs62.1
UNKNOWN120790Substation-Adjacent161 kV100 MW1.0 yrs62.1
TAP154790Substation-Adjacent161 kV100 MW1.0 yrs61.5
TAP154792Substation-Adjacent161 kV100 MW1.0 yrs61.5
UNKNOWN120789Substation-Adjacent161 kV100 MW1.0 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (BROWNSVILLE - AURORA), Haywood County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.