OZ Curry

Greenfield

Curry County, New Mexico · SPP

DC Readiness
49.4
Fair / 100

OZ Curry is a greenfield datacenter candidate site in Curry County, New Mexico, interconnecting through SPP. It screens at 49.4/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneSPP_SOUTH
Wholesale LMP$15.62/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth24
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance95.9 mi
Fiber providers4
Fiber coverage90.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance383.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerARKANSAS RIVER POWER AUTHORITY
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)4.00
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index65.1 (avg 100)

Location context

Nearest datacenterAligned Lubbock
DC distance92.8 mi
Nearest rail2.8 mi
Nearest gas pipeline4.3 mi
Nearest fiber route171.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity11.61¢/kWh
Industrial electricity8.28¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$763

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
73
Energy cost10%
91
Water risk8%
41
Natural hazard8%
60
Buildability7%
5
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
96
Gas pipeline2%
86
Tax incentive2%
0
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Curry County, ranked by DC Readiness.

Sites near OZ Curry
SiteTypeVoltageCapacityQueue waitScore
ROOSEVELT COUNTYSubstation-Adjacent345 kV600 MW3.4 yrs70.8
TAP305178Substation-Adjacent230 kV300 MW3.4 yrs68.0
UNKNOWN304303Substation-Adjacent230 kV300 MW3.4 yrs65.7
Greenfield (BLACKWATER TIE - TAIBAN MESA)Greenfield345 kV600 MW3.4 yrs63.5
TAP318068Substation-Adjacent115 kV100 MW3.4 yrs62.5
Greenfield (BLACKWATER TIE - TAIBAN MESA)Greenfield345 kV600 MW3.4 yrs62.2
Greenfield (BLACKWATER TIE - TAIBAN MESA)Greenfield345 kV600 MW3.4 yrs62.2
NORTH CLOVISSubstation-Adjacent115 kV100 MW3.4 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Curry, Curry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.