Skip to content
Gridcensus

UNKNOWN132256

Substation-Adjacent

Rockland, New Jersey · PJM

DC Readiness
66.5
Good / 100

UNKNOWN132256 is a substation-adjacent datacenter candidate site in Rockland, New Jersey, interconnecting through PJM. It screens at 66.5/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132256
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDatabank Orangeburg (LGA3)
IXP distance8.7 mi
Fiber providers8
Fiber coverage99.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterNYSE Data Center
DC distance0.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.67¢/kWh
Industrial electricity6.84¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$13,052

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN132256

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
37
Fiber connectivity12%
93
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Rockland, ranked by DC Readiness.

Sites near UNKNOWN132256
SiteTypeVoltageCapacityQueue waitScore
Bowline PointBrownfield—750 MW4.9 yrs69.3
RAMAPOSubstation-Adjacent500 kV1,000 MW4.9 yrs67.9
W. HAVERSTRAWSubstation-Adjacent345 kV600 MW4.9 yrs65.5
BUCHANANSubstation-Adjacent345 kV600 MW4.9 yrs65.4
LADENTOWNSubstation-Adjacent345 kV600 MW4.9 yrs65.1
EC Near Bowline PointGreenfield——3.5 yrs59.7
UNKNOWN129180Substation-Adjacent138 kV100 MW4.9 yrs59.6
UNKNOWN129572Substation-Adjacent138 kV100 MW4.9 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN132256, Rockland. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.