EC Near Howard Down
GreenfieldCumberland, New Jersey · PJM
EC Near Howard Down is a greenfield datacenter candidate site in Cumberland, New Jersey, interconnecting through PJM. It screens at 57.2/100 DC Readiness and a 2.6 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Cumberland, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CUMBERLAND (NJ) | Substation-Adjacent | 230 kV | 300 MW | 2.6 yrs | 67.5 |
| SHERMAN STATION | Substation-Adjacent | 138 kV | 100 MW | 2.6 yrs | 62.4 |
| EC Near Howard Down | Greenfield | — | — | 2.6 yrs | 61.5 |
| UNIOIN STATION | Substation-Adjacent | 138 kV | 100 MW | 2.6 yrs | 60.8 |
| OZ Cumberland | Greenfield | — | — | 2.6 yrs | 59.6 |
| LINCOLN STATION | Substation-Adjacent | 138 kV | 100 MW | 2.6 yrs | 59.1 |
| EC Near Carlls Corner | Greenfield | — | — | 2.6 yrs | 59.0 |
| EC Near Howard Down | Greenfield | — | — | 2.6 yrs | 58.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.