OZ Rockingham is a greenfield datacenter candidate site in Rockingham County, New Hampshire, interconnecting through ISO-NE. It screens at 58.2/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_NH
Wholesale LMP$68.97/MWh
Utility commercial rate0.16¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth6
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPNavisite Andover
IXP distance21.2 mi
Fiber providers7
Fiber coverage67.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance434.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerPUBLIC SERVICE CO OF NH
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteUS FOOD SERVICE INC
Hazard sub-score75/100
Construction cost index109.1 (avg 100)

Location context

Nearest datacenterInformation Technology Data Center
DC distance6.8 mi
Nearest rail4.0 mi
Nearest gas pipeline4.1 mi
Nearest fiber route13.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.63¢/kWh
Industrial electricity13.26¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$17,929

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
60
Fiber connectivity12%
76
Energy cost10%
58
Water risk8%
94
Natural hazard8%
75
Buildability7%
40
Labor market4%
50
DC cluster4%
80
Land / acreage3%
38
Construction cost3%
59
Gas pipeline2%
87
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Rockingham County, ranked by DC Readiness.

Sites near OZ Rockingham
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132717Substation-Adjacent230 kV300 MW3.5 yrs73.5
SCOBIE POND 345KVSubstation-Adjacent345 kV600 MW3.5 yrs73.5
ESSENTIAL POWER NEWINGTON LLCSubstation-Adjacent345 kV600 MW3.5 yrs73.1
UNKNOWN132750Substation-Adjacent345 kV600 MW3.5 yrs71.2
SCOBIE POND 345KVSubstation-Adjacent345 kV600 MW3.5 yrs70.8
TIMBER SWAMPSubstation-Adjacent345 kV600 MW3.5 yrs70.0
WATTS BROOKSubstation-Adjacent230 kV300 MW3.5 yrs69.8
UNKNOWN132750Substation-Adjacent345 kV600 MW3.5 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Rockingham, Rockingham County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.