DC Readiness
52.6
Fair / 100

OZ Coos is a greenfield datacenter candidate site in Coos County, New Hampshire, interconnecting through ISO-NE. It screens at 52.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_NH
Wholesale LMP$68.97/MWh
Utility commercial rate0.15¢/kWh
UtilityPUBLIC SERVICE CO OF NHinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth3
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPFirstLight Regen Hut
IXP distance85.2 mi
Fiber providers5
Fiber coverage80.1%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance508.8 mi

Site characteristics

Site typeGreenfield
Land contactCoos County Assessor
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index124.2 (avg 100)

Location context

Nearest datacenterOxford Networks
DC distance84.1 mi
Nearest rail10.4 mi
Nearest gas pipeline6.7 mi
Nearest fiber route19.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.16¢/kWh
Industrial electricity13.23¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$4,071

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Coos

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
65
Energy cost10%
65
Water risk7%
86
Natural hazard6%
85
Buildability7%
40
Labor market4%
50
DC cluster4%
20
Land / acreage3%
45
Construction cost3%
47
Gas pipeline2%
78
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Coos County, ranked by DC Readiness.

Sites near OZ Coos
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN137038Substation-Adjacent115 kV100 MW3.9 yrs56.0
UNKNOWN132754Substation-Adjacent115 kV100 MW3.9 yrs56.0
UNKNOWN132759Substation-Adjacent115 kV100 MW3.9 yrs56.0
TAP137033Substation-Adjacent115 kV100 MW3.9 yrs55.8
UNKNOWN137022Substation-Adjacent115 kV100 MW3.9 yrs55.7
UNKNOWN137036Substation-Adjacent115 kV100 MW3.9 yrs55.7
UNKNOWN137035Substation-Adjacent115 kV100 MW3.9 yrs55.4
OZ CoosGreenfield——3.5 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Coos, Coos County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.