Storey County, Nevada · WECC

DC Readiness
55.4
Good / 100

NORTHWEST is a substation-adjacent datacenter candidate site in Storey County, Nevada, interconnecting through WECC. It screens at 55.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORTHWEST
Substation distance0.0 mi
Substation voltage120 kV
Available capacity100 MW
UtilitySIERRA PACIFIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWClean Transition Tariff (large loads)

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Nearest IXPCENTRA RNO01 - Reno Nevada (200 S. Virginia)
IXP distance3.2 mi
Fiber providers2
Fiber coverage2.4%

Site characteristics

Land contactStorey County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterSwitch Tahoe Reno
DC distance2.9 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity5.83¢/kWh
Industrial electricity5.01¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$77,197

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NORTHWEST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
57
Speed to power20%
45
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Storey County, ranked by DC Readiness.

Sites near NORTHWEST
SiteTypeVoltageCapacityQueue waitScore
TRACYSubstation-Adjacent360 kV600 MW6.9 yrs63.1
NORTH VALLEY ROADSubstation-Adjacent345 kV600 MW6.9 yrs61.7
MIRA LOMASubstation-Adjacent360 kV600 MW6.9 yrs61.7
SUGAR LOAFSubstation-Adjacent360 kV600 MW6.9 yrs59.6
EC Near TracyGreenfield——5.8 yrs58.9
EC Near TracyGreenfield——5.8 yrs58.7
Valley RoadBrownfield120 kV6 MW5.8 yrs58.7
EC Near TracyGreenfield——5.8 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for NORTHWEST, Storey County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.