PUCI, CAAS Well 2

Industrial

Nye County, Nevada · WECC

DC Readiness
46.8
Fair / 100

At a glance

PUCI, CAAS Well 2 is an industrial datacenter candidate site in Nye County, Nevada, scoring 46.8/100 DC Readiness — 26th of 116 scored sites in the county. It sits in the WECC grid region and the VALLEY ELECTRIC ASSN, INC service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityVALLEY ELECTRIC ASSN, INCcooperative

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth77
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPSwitch Las Vegas
IXP distance38.8 mi
Fiber providers2
Fiber coverage70.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterSwitch Las Vegas 14
DC distance38.1 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity8.32¢/kWh
Industrial electricity6.79¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$3,089

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PUCI, CAAS Well 2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does PUCI, CAAS Well 2 compare with other sites in Nye County?

PUCI, CAAS Well 2 ranks 26th of 116 scored candidate sites in Nye County. Its 46.8/100 is roughly in line with the county average of 46.3. It is roughly in line with the Nevada average of 48.5 and about 12% below the national average of 53.2.

Against the Nevada average, its strongest sub-score is speed to power (51 vs 47) and its weakest is power availability (30 vs 35). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is PUCI, CAAS Well 2 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Switch Las Vegas at 38.8 miles. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Switch Las Vegas 14, 38.1 miles away.

What are the flood, water and hazard risks at PUCI, CAAS Well 2?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Nye County "Very Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Nye County, ranked by DC Readiness.

Sites near PUCI, CAAS Well 2
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305563Substation-Adjacent230 kV300 MW3.5 yrs56.3
EC Coal Nye CountyGreenfield——3.5 yrs52.9
EC Coal Nye CountyGreenfield——3.5 yrs51.1
EC Near GabbsGreenfield——3.5 yrs51.1
EC Near GabbsGreenfield——3.5 yrs50.8
EC Near GabbsGreenfield——3.5 yrs50.7
EC Near GabbsGreenfield——3.5 yrs50.6
EC Near GabbsGreenfield——3.5 yrs50.6

PUCI, CAAS Well 2: common questions

What is the DC Readiness score of PUCI, CAAS Well 2?

PUCI, CAAS Well 2 scores 46.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 116 scored sites in Nye County. The Nye County average is 46.3 and the Nevada average is 48.5.

Which electric utility serves PUCI, CAAS Well 2?

VALLEY ELECTRIC ASSN, INC (cooperative) holds the retail service territory that contains the site; its holding company is VALLEY ELECTRIC ASSOCIATION COOPERATIVE.

What grid region is PUCI, CAAS Well 2 in?

PUCI, CAAS Well 2 is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

Is PUCI, CAAS Well 2 in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is PUCI, CAAS Well 2 from an internet exchange?

The nearest internet exchange facility is Switch Las Vegas, about 38.8 miles away; 2 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “PUCI, CAAS Well 2, Nye County, NV”, https://gridcensus.com/datacenter-sites/nevada/nye-county/puci-caas-well-2-16d38d32 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for PUCI, CAAS Well 2, Nye County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.