Skip to content
Gridcensus

York Landfill Solar

Brownfield

York, Nebraska · SPP

DC Readiness
65.7
Good / 100

York Landfill Solar is a brownfield datacenter candidate site in York, Nebraska, interconnecting through SPP. It screens at 65.7/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN158112
Substation distance0.9 mi
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth13
Avg queue wait3.3 yrs

Connectivity

Nearest IXPBinary Net Vault
IXP distance46.7 mi
Fiber providers9
Fiber coverage73.0%
Nearest cloud providerGoogle
Nearest cloud regionus-central1
Cloud region distance94.2 mi

Site characteristics

Site typeBrownfield
Acreage17 ac
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)2.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMOSES MOTOR COMPANY
Hazard sub-score62/100
Construction cost index77.7 (avg 100)

Location context

Nearest datacenterLincoln Data Centers
DC distance46.7 mi
Nearest rail0.3 mi
Nearest gas pipeline0.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.67¢/kWh
Industrial electricity7.28¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$7,906

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
52
Speed to power15%
49
Fiber connectivity12%
71
Energy cost10%
100
Water risk8%
76
Natural hazard8%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
45
Land / acreage3%
49
Construction cost3%
85
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in York, ranked by DC Readiness.

Sites near York Landfill Solar
SiteTypeVoltageCapacityQueue waitScore
EC Near MobileGreenfield3.5 yrs61.4
EC Near MobileGreenfield3.5 yrs60.8
EC Near MobileGreenfield3.5 yrs60.2
UNKNOWN131727Substation-Adjacent345 kV600 MW3.3 yrs60.1
OZ YorkGreenfield3.5 yrs60.1
EC Near MobileGreenfield3.5 yrs59.9
EC Near MobileGreenfield3.5 yrs59.9
EC Near MobileGreenfield3.5 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for York Landfill Solar, York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.