At a glance

Bostwick (P-S) at 40.062, -98.373 is a federal excess datacenter candidate site in Webster County, Nebraska, scoring 50.7/100 DC Readiness — 24th of 46 scored sites in the county. It sits in the SPP grid region and the SOUTH CENTRAL PUBLIC PWR DIST service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilitySOUTH CENTRAL PUBLIC PWR DISTnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance43.9 mi
Fiber providers4
Fiber coverage81.7%

Site characteristics

Acreage37 ac
Buildable load (est.)~15–37 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterBeloit-NOC
DC distance43.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.79¢/kWh
Industrial electricity9.62¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$4,213

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Bostwick (P-S)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Bostwick (P-S) at 40.062, -98.373 compare with other sites in Webster County?

Bostwick (P-S) at 40.062, -98.373 ranks 24th of 46 scored candidate sites in Webster County. Its 50.7/100 is roughly in line with the county average of 51.6. It is roughly in line with the Nebraska average of 52.1 and roughly in line with the national average of 53.2.

Against the Nebraska average, its strongest sub-score is fiber connectivity (70 vs 66) and its weakest is power availability (30 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Bostwick (P-S) at 40.062, -98.373 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Beloit-NOC at 43.9 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Beloit-NOC, 43.9 miles away.

What are the flood, water and hazard risks at Bostwick (P-S) at 40.062, -98.373?

At the county level, FEMA's National Risk Index rates Webster County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Webster County, ranked by DC Readiness.

Sites near Bostwick (P-S) at 40.062, -98.373
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131968Substation-Adjacent115 kV100 MW4.3 yrs56.8
UNKNOWN168312Substation-Adjacent69 kV50 MW4.3 yrs54.9
UNKNOWN158095Substation-Adjacent69 kV50 MW4.3 yrs54.9
UNKNOWN157210Substation-Adjacent69 kV50 MW4.3 yrs54.8
TAP168311Substation-Adjacent69 kV50 MW4.3 yrs54.8
TAP168315Substation-Adjacent69 kV50 MW4.3 yrs54.7
UNKNOWN168314Substation-Adjacent69 kV50 MW4.3 yrs54.7
TAP168316Substation-Adjacent69 kV50 MW4.3 yrs54.6

Bostwick (P-S) at 40.062, -98.373: common questions

What is the DC Readiness score of Bostwick (P-S) at 40.062, -98.373?

Bostwick (P-S) at 40.062, -98.373 scores 50.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 24th of 46 scored sites in Webster County. The Webster County average is 51.6 and the Nebraska average is 52.1.

Which electric utility serves Bostwick (P-S) at 40.062, -98.373?

SOUTH CENTRAL PUBLIC PWR DIST (not available) holds the retail service territory that contains the site.

What grid region is Bostwick (P-S) at 40.062, -98.373 in?

Bostwick (P-S) at 40.062, -98.373 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Bostwick (P-S) at 40.062, -98.373 from an internet exchange?

The nearest internet exchange facility is Beloit-NOC, about 43.9 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Bostwick (P-S) at 40.062, -98.373, Webster County, NE”, https://gridcensus.com/datacenter-sites/nebraska/webster-county/bostwick-p-s-8a2e8e80 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Bostwick (P-S) at 40.062, -98.373, Webster County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.