Skip to content
Gridcensus

UNKNOWN132416

Substation-Adjacent

Thayer County, Nebraska · SPP

DC Readiness
56.2
Good / 100

UNKNOWN132416 is a substation-adjacent datacenter candidate site in Thayer County, Nebraska, interconnecting through SPP. It screens at 56.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132416
Nearest grid bottleneckTMP918_33023 · 149 km (SPP)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNORRIS PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance56.7 mi
Fiber providers6
Fiber coverage68.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterBeloit-NOC
DC distance56.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.25¢/kWh
Industrial electricity8.18¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$6,039

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track UNKNOWN132416

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
54
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Thayer County, ranked by DC Readiness.

Sites near UNKNOWN132416
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132415Substation-Adjacent115 kV100 MW4.3 yrs56.5
UNKNOWN132417Substation-Adjacent115 kV100 MW4.3 yrs56.3
Mine SiteFormer Mine——4.3 yrs50.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN132416, Thayer County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.