Bridgeport Head Start

Industrial

Morrill County, Nebraska · SPP

DC Readiness
41.3
Fair / 100

Bridgeport Head Start is a industrial datacenter candidate site in Morrill County, Nebraska, interconnecting through SPP. It screens at 41.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth31

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance93.0 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterWindbreak Cable
DC distance60.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.36¢/kWh
Industrial electricity11.68¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,682

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Morrill County, ranked by DC Readiness.

Sites near Bridgeport Head Start
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131807Substation-Adjacent115 kV100 MW3.5 yrs63.0
TAP134759Substation-Adjacent115 kV100 MW3.5 yrs62.4
UNKNOWN131806Substation-Adjacent115 kV100 MW3.5 yrs61.3
UNKNOWN131809Substation-Adjacent115 kV100 MW3.5 yrs61.2
UNKNOWN131808Substation-Adjacent115 kV100 MW3.5 yrs60.8
Greenfield (TAP134758 - TAP134759)Greenfield115 kV100 MW3.5 yrs58.1
Greenfield (UNKNOWN131804 - UNKNOWN131806)Greenfield115 kV100 MW3.5 yrs57.7
Greenfield (UNKNOWN131804 - UNKNOWN131806)Greenfield115 kV100 MW3.5 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.