Skip to content
Gridcensus

403 Main Street

Industrial

Morrill County, Nebraska · SPP

DC Readiness
49.2
Fair / 100

403 Main Street is an industrial datacenter candidate site in Morrill County, Nebraska, interconnecting through SPP. It screens at 49.2/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityCHIMNEY ROCK PUBLIC POWER DISTnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance85.2 mi
Fiber providers5
Fiber coverage32.3%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterWindbreak Cable
DC distance55.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.36¢/kWh
Industrial electricity11.68¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,682

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 403 Main Street

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Morrill County, ranked by DC Readiness.

Sites near 403 Main Street
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131806Substation-Adjacent115 kV100 MW3.3 yrs55.1
TAP134759Substation-Adjacent115 kV100 MW3.3 yrs54.9
UNKNOWN131808Substation-Adjacent115 kV100 MW3.3 yrs53.9
UNKNOWN131809Substation-Adjacent115 kV100 MW3.3 yrs53.6
Former Century LumberIndustrial——3.3 yrs49.2
203 Center Ave.Industrial——3.3 yrs49.2
Mine SiteFormer Mine——3.3 yrs49.2
R&M BuildingIndustrial——3.3 yrs49.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 403 Main Street, Morrill County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.