Kimball Substation at 41.227, -103.662

Federal Excess

Kimball, Nebraska · SPP

DC Readiness
49.9
Fair / 100

At a glance

Kimball Substation at 41.227, -103.662 is a federal excess datacenter candidate site in Kimball, Nebraska, scoring 49.9/100 DC Readiness — 26th of 26 scored sites in the county. It sits in the SPP grid region and the CITY OF KIMBALL - (NE) service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityCITY OF KIMBALL - (NE)not availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance56.6 mi
Fiber providers5
Fiber coverage29.1%

Site characteristics

Acreage15 ac
Buildable load (est.)~6–15 MWland-based
Former usePower Development and Distribution

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterWindbreak Cable
DC distance21.4 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.36¢/kWh
Industrial electricity11.68¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,701

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Kimball Substation

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Kimball Substation at 41.227, -103.662 compare with other sites in Kimball?

Kimball Substation at 41.227, -103.662 ranks 26th of 26 scored candidate sites in Kimball. Its 49.9/100 is about 10% below the county average of 55.6. It is roughly in line with the Nebraska average of 52.1 and roughly in line with the national average of 53.2.

Against the Nebraska average, its strongest sub-score is natural hazard (72 vs 70) and its weakest is fiber connectivity (58 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Kimball Substation at 41.227, -103.662 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Lunavi - Cheyenne at 56.6 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Windbreak Cable, 21.4 miles away.

What are the flood, water and hazard risks at Kimball Substation at 41.227, -103.662?

At the county level, FEMA's National Risk Index rates Kimball "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Kimball, ranked by DC Readiness.

Sites near Kimball Substation at 41.227, -103.662
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN201543Substation-Adjacent230 kV300 MW4.3 yrs58.9
UNKNOWN201538Substation-Adjacent230 kV300 MW4.3 yrs58.7
UNKNOWN202730Substation-Adjacent161 kV100 MW4.3 yrs58.6
EC Near KimballGreenfield——4.3 yrs58.3
EC Near KimballGreenfield——4.3 yrs58.1
EC Near KimballGreenfield——4.3 yrs58.1
EC Near KimballGreenfield——4.3 yrs57.9
EC Near KimballGreenfield——4.3 yrs57.8

Kimball Substation at 41.227, -103.662: common questions

What is the DC Readiness score of Kimball Substation at 41.227, -103.662?

Kimball Substation at 41.227, -103.662 scores 49.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 26 scored sites in Kimball. The Kimball average is 55.6 and the Nebraska average is 52.1.

Which electric utility serves Kimball Substation at 41.227, -103.662?

CITY OF KIMBALL - (NE) (not available) holds the retail service territory that contains the site.

What grid region is Kimball Substation at 41.227, -103.662 in?

Kimball Substation at 41.227, -103.662 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Kimball Substation at 41.227, -103.662 from an internet exchange?

The nearest internet exchange facility is Lunavi - Cheyenne, about 56.6 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Kimball Substation at 41.227, -103.662, Kimball, NE”, https://gridcensus.com/datacenter-sites/nebraska/kimball/kimball-substation-3f22717b (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Kimball Substation at 41.227, -103.662, Kimball is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.