Greenfield (UNKNOWN131809 - UNKNOWN131811)

Greenfield

Garden County, Nebraska · SPP

DC Readiness
48.7
Fair / 100

Greenfield (UNKNOWN131809 - UNKNOWN131811) is a greenfield datacenter candidate site in Garden County, Nebraska, interconnecting through SPP. It screens at 48.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN131809
Nearest grid bottleneckSIDOGASIDKEY · 84 km (SPP)
Substation voltage115 kV
Available capacity100 MW
UtilityWHEAT BELT PUBLIC POWER DISTnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance118.3 mi
Fiber providers6
Fiber coverage64.0%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterWindbreak Cable
DC distance83.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.72¢/kWh
Industrial electricity13.49¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,256

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track Greenfield (UNKNOWN131809 - UNKNOWN131811)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
52
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Garden County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN131809 - UNKNOWN131811)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131856Substation-Adjacent115 kV100 MW3.3 yrs55.1
UNKNOWN157575Substation-Adjacent115 kV100 MW3.3 yrs54.9
TAP162768Substation-Adjacent115 kV100 MW3.3 yrs54.9
UNKNOWN131811Substation-Adjacent115 kV100 MW3.3 yrs54.7
Former Midwec BuildingIndustrial——3.3 yrs49.3
Mine SiteFormer Mine——3.3 yrs49.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.