Bostwick (P-S)

Federal Excess

Franklin County, Nebraska · SPP

DC Readiness
41.1
Fair / 100

Bostwick (P-S) is a federal excess datacenter candidate site in Franklin County, Nebraska, interconnecting through SPP. It screens at 41.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth31

Connectivity

Nearest IXPBeloit-NOC
IXP distance63.0 mi

Site characteristics

Acreage27 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCompute North
DC distance43.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.97¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$4,265

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
36
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Franklin County, ranked by DC Readiness.

Sites near Bostwick (P-S)
SiteTypeVoltageCapacityQueue waitScore
AXTELLSubstation-Adjacent345 kV600 MW3.5 yrs68.6
Greenfield (POST ROCK - AXTELL)Greenfield345 kV600 MW3.5 yrs64.8
Greenfield (POST ROCK - AXTELL)Greenfield345 kV600 MW3.5 yrs64.3
Greenfield (POST ROCK - AXTELL)Greenfield345 kV600 MW3.5 yrs64.3
Greenfield (POST ROCK - AXTELL)Greenfield345 kV600 MW3.5 yrs59.3
Former Lincoln HotelIndustrial41.3
Bostwick (P-S)Federal Excess41.2
Bostwick (P-S)Federal Excess41.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen