OZ Douglas

Greenfield

Douglas County, Nebraska · SPP

DC Readiness
66.9
Good / 100

OZ Douglas is a greenfield datacenter candidate site in Douglas County, Nebraska, interconnecting through SPP. It screens at 66.9/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckNEBS56S40S55 · 77 km (SPP)
LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.08¢/kWh
UtilityOMAHA PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXP1623 Farmam
IXP distance2.9 mi
Fiber providers17
Fiber coverage86.3%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance5.8 mi

Site characteristics

Site typeGreenfield
Land contactDouglas County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)2.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAMERICAN HYDRAULICS
Hazard sub-score62/100
Construction cost index93.4 (avg 100)

Location context

Nearest datacenterDatacenter 256728809
DC distance2.7 mi
Nearest rail1.7 mi
Nearest gas pipeline2.1 mi
Nearest fiber route1.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.20¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$9,113

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Douglas

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
96
Energy cost10%
91
Water risk7%
73
Natural hazard6%
62
Buildability7%
92
Labor market4%
50
DC cluster4%
100
Land / acreage3%
58
Construction cost3%
72
Gas pipeline2%
93
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near OZ Douglas
SiteTypeVoltageCapacityQueue waitScore
OPPD BLONDO STREETSubstation-Adjacent345 kV600 MW3.3 yrs67.8
OZ DouglasGreenfield——3.5 yrs67.5
EC Coal Douglas CountyGreenfield——3.5 yrs66.2
EC Coal Douglas CountyGreenfield——3.5 yrs66.0
EC Coal Douglas CountyGreenfield——3.5 yrs64.8
OZ DouglasGreenfield——3.5 yrs64.2
UNKNOWN131673Substation-Adjacent161 kV100 MW3.3 yrs63.0
UNKNOWN132689Substation-Adjacent161 kV100 MW3.3 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Douglas, Douglas County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.