Ainsworth (P-S) at 42.712, -100.783

Federal Excess

Cherry County, Nebraska · SPP

DC Readiness
46.0
Fair / 100

At a glance

Ainsworth (P-S) at 42.712, -100.783 is a federal excess datacenter candidate site in Cherry County, Nebraska, scoring 46.0/100 DC Readiness — 36th of 37 scored sites in the county. It sits in the SPP grid region and the LACREEK ELECTRIC ASSN, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityLACREEK ELECTRIC ASSN, INCnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPGolden West Rapid City Skyline Facility
IXP distance154.2 mi
Fiber providers7
Fiber coverage76.6%

Site characteristics

Acreage27 ac
Buildable load (est.)~11–27 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterGolden West Rapid City Skyline Facility
DC distance154.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.51¢/kWh
Industrial electricity13.01¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,224

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Ainsworth (P-S)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Ainsworth (P-S) at 42.712, -100.783 compare with other sites in Cherry County?

Ainsworth (P-S) at 42.712, -100.783 ranks 36th of 37 scored candidate sites in Cherry County. Its 46.0/100 is roughly in line with the county average of 47.6. It is about 12% below the Nebraska average of 52.1 and about 14% below the national average of 53.2.

Against the Nebraska average, its strongest sub-score is natural hazard (72 vs 70) and its weakest is fiber connectivity (38 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Ainsworth (P-S) at 42.712, -100.783 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Golden West Rapid City Skyline Facility at 154.2 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Golden West Rapid City Skyline Facility, 154.2 miles away.

What are the flood, water and hazard risks at Ainsworth (P-S) at 42.712, -100.783?

At the county level, FEMA's National Risk Index rates Cherry County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
38
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Cherry County, ranked by DC Readiness.

Sites near Ainsworth (P-S) at 42.712, -100.783
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132459Substation-Adjacent115 kV100 MW4.3 yrs52.4
Ainsworth (P-S)Federal Excess——4.3 yrs49.2
Ainsworth (P-S)Federal Excess——4.3 yrs48.8
Ainsworth (P-S)Federal Excess——4.3 yrs48.4
Ainsworth (P-S)Federal Excess——4.3 yrs48.4
Ainsworth (P-S)Federal Excess——4.3 yrs48.3
Ainsworth (P-S)Federal Excess——4.3 yrs48.3
Ainsworth (P-S)Federal Excess——4.3 yrs48.3

Ainsworth (P-S) at 42.712, -100.783: common questions

What is the DC Readiness score of Ainsworth (P-S) at 42.712, -100.783?

Ainsworth (P-S) at 42.712, -100.783 scores 46.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 36th of 37 scored sites in Cherry County. The Cherry County average is 47.6 and the Nebraska average is 52.1.

Which electric utility serves Ainsworth (P-S) at 42.712, -100.783?

LACREEK ELECTRIC ASSN, INC (not available) holds the retail service territory that contains the site.

What grid region is Ainsworth (P-S) at 42.712, -100.783 in?

Ainsworth (P-S) at 42.712, -100.783 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Ainsworth (P-S) at 42.712, -100.783 from an internet exchange?

The nearest internet exchange facility is Golden West Rapid City Skyline Facility, about 154.2 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Ainsworth (P-S) at 42.712, -100.783, Cherry County, NE”, https://gridcensus.com/datacenter-sites/nebraska/cherry-county/ainsworth-p-s-c51aeeb9 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Ainsworth (P-S) at 42.712, -100.783, Cherry County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.