Greenfield (UNKNOWN131812 - UNKNOWN131860)

Greenfield

Arthur County, Nebraska · SPP

DC Readiness
49.7
Fair / 100

At a glance

Greenfield (UNKNOWN131812 - UNKNOWN131860) is a greenfield datacenter candidate site in Arthur County, Nebraska, scoring 49.7/100 DC Readiness — 2nd of 2 scored sites in the county. Its nearest substation is UNKNOWN131812. It sits in the SPP grid region and the PANHANDLE RURAL EL MEMBER ASSN service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN131812
Nearest grid bottleneckSIDOGASIDKEY · 33 km (SPP)
Substation voltage115 kV
Available capacity100 MW
UtilityPANHANDLE RURAL EL MEMBER ASSNnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Fiber providers2
Fiber coverage99.6%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterWindbreak Cable
DC distance125.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.11¢/kWh
Industrial electricity13.25¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,091

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 1 nearby

Get alerts

Track Greenfield (UNKNOWN131812 - UNKNOWN131860)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN131812 - UNKNOWN131860) compare with other sites in Arthur County?

Greenfield (UNKNOWN131812 - UNKNOWN131860) ranks 2nd of 2 scored candidate sites in Arthur County. Its 49.7/100 is roughly in line with the county average of 52.4. It is roughly in line with the Nebraska average of 52.1 and roughly in line with the national average of 53.2.

Against the Nebraska average, its strongest sub-score is fiber connectivity (70 vs 66) and its weakest is power availability (28 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN131812 - UNKNOWN131860) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN131812, is the closest grid connection point on record and operates at 115 kV. The nearest located transmission bottleneck is SIDOGASIDKEY (SPP), 21 miles away. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Windbreak Cable, 125.9 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN131812 - UNKNOWN131860)?

At the county level, FEMA's National Risk Index rates Arthur County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
54
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Arthur County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN131812 - UNKNOWN131860)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131812Substation-Adjacent115 kV100 MW4.3 yrs55.0

Greenfield (UNKNOWN131812 - UNKNOWN131860): common questions

What is the DC Readiness score of Greenfield (UNKNOWN131812 - UNKNOWN131860)?

Greenfield (UNKNOWN131812 - UNKNOWN131860) scores 49.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 2nd of 2 scored sites in Arthur County. The Arthur County average is 52.4 and the Nebraska average is 52.1.

What is the nearest substation to Greenfield (UNKNOWN131812 - UNKNOWN131860)?

The nearest mapped substation is UNKNOWN131812, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Greenfield (UNKNOWN131812 - UNKNOWN131860)?

PANHANDLE RURAL EL MEMBER ASSN (not available) holds the retail service territory that contains the site.

What grid region is Greenfield (UNKNOWN131812 - UNKNOWN131860) in?

Greenfield (UNKNOWN131812 - UNKNOWN131860) is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN131812 - UNKNOWN131860), Arthur County, NE”, https://gridcensus.com/datacenter-sites/nebraska/arthur-county/greenfield-unknown131812-unknown131860-39b294f8 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN131812 - UNKNOWN131860), Arthur County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.