Harlowton Milwaukee Roundhouse

Industrial

Wheatland County, Montana · SPP

DC Readiness
52.8
Fair / 100

At a glance

Harlowton Milwaukee Roundhouse is an industrial datacenter candidate site in Wheatland County, Montana, scoring 52.8/100 DC Readiness — 29th of 29 scored sites in the county. It sits in the SPP grid region and the FERGUS ELECTRIC COOP, INC service territory, where interconnection has averaged 1.1 years from request to operation.

Power & interconnection

UtilityFERGUS ELECTRIC COOP, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.1 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSPP
Queue depth1
Avg queue wait1.1 yrs
Recent queue wait1.1 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPParsec
IXP distance75.5 mi
Fiber providers3
Fiber coverage94.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterParsec Data Management
DC distance75.5 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (property_tax_abatement)
Commercial electricity8.42¢/kWh
Industrial electricity8.61¢/kWh
Cooling degree days400
Heating degree days7,600
Land price / acre$1,197

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: New/expanding industry tax abatement available for DC construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Harlowton Milwaukee Roundhouse

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Harlowton Milwaukee Roundhouse compare with other sites in Wheatland County?

Harlowton Milwaukee Roundhouse ranks 29th of 29 scored candidate sites in Wheatland County. Its 52.8/100 is roughly in line with the county average of 55.9. It is roughly in line with the Montana average of 54.3 and roughly in line with the national average of 53.2.

Against the Montana average, its strongest sub-score is speed to power (68 vs 64) and its weakest is power availability (30 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Harlowton Milwaukee Roundhouse to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Parsec at 75.5 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Parsec Data Management, 75.5 miles away.

What are the flood, water and hazard risks at Harlowton Milwaukee Roundhouse?

At the county level, FEMA's National Risk Index rates Wheatland County "Very Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
68
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
56
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Wheatland County, ranked by DC Readiness.

Sites near Harlowton Milwaukee Roundhouse
SiteTypeVoltageCapacityQueue waitScore
JUDITH GAPSubstation-Adjacent230 kV300 MW1.1 yrs64.5
JUDITH GAP WIND FARMSubstation-Adjacent230 kV300 MW1.1 yrs64.3
TAP205596Substation-Adjacent115 kV100 MW1.1 yrs60.1
UNKNOWN204179Substation-Adjacent115 kV100 MW1.1 yrs59.3
TAP208501Substation-Adjacent69 kV50 MW1.1 yrs58.2
UNKNOWN208504Substation-Adjacent69 kV50 MW1.1 yrs58.0
TAP208503Substation-Adjacent69 kV50 MW1.1 yrs58.0
UNKNOWN208507Substation-Adjacent69 kV50 MW1.1 yrs57.8

Harlowton Milwaukee Roundhouse: common questions

What is the DC Readiness score of Harlowton Milwaukee Roundhouse?

Harlowton Milwaukee Roundhouse scores 52.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 29 scored sites in Wheatland County. The Wheatland County average is 55.9 and the Montana average is 54.3.

Which electric utility serves Harlowton Milwaukee Roundhouse?

FERGUS ELECTRIC COOP, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Harlowton Milwaukee Roundhouse in?

Harlowton Milwaukee Roundhouse is in the SPP region. Projects interconnecting there have averaged a 1.1-year wait from queue request to operation.

How far is Harlowton Milwaukee Roundhouse from an internet exchange?

The nearest internet exchange facility is Parsec, about 75.5 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Harlowton Milwaukee Roundhouse, Wheatland County, MT”, https://gridcensus.com/datacenter-sites/montana/wheatland-county/harlowton-milwaukee-roundhouse-d810c5b1 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Harlowton Milwaukee Roundhouse, Wheatland County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.