Skip to content
Gridcensus

Roundup 37

Industrial

Musselshell County, Montana · SPP

DC Readiness
51.6
Fair / 100

Roundup 37 is an industrial datacenter candidate site in Musselshell County, Montana, interconnecting through SPP. It screens at 51.6/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityNORTHWESTERN ENERGY LLC - (MT)investor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth35
Avg queue wait3.3 yrs

Connectivity

Nearest IXPiConnect Billings Fiber Hotel
IXP distance45.6 mi
Fiber providers2
Fiber coverage92.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenteriConnect Billings Fiber Hotel
DC distance45.6 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (property_tax_abatement)
Commercial electricity9.55¢/kWh
Industrial electricity9.54¢/kWh
Cooling degree days400
Heating degree days7,600
Land price / acre$1,077

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: New/expanding industry tax abatement available for DC construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Roundup 37

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
56
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Musselshell County, ranked by DC Readiness.

Sites near Roundup 37
SiteTypeVoltageCapacityQueue waitScore
EC Coal Musselshell CountyGreenfield——1.1 yrs61.3
UNKNOWN204182Substation-Adjacent115 kV100 MW3.3 yrs58.7
UNKNOWN204181Substation-Adjacent115 kV100 MW3.3 yrs57.6
EC Coal Musselshell CountyGreenfield——1.1 yrs56.6
TAP208477Substation-Adjacent69 kV50 MW3.3 yrs56.2
UNKNOWN208471Substation-Adjacent69 kV50 MW3.3 yrs55.4
UNKNOWN208465Substation-Adjacent69 kV50 MW3.3 yrs54.7
UNKNOWN208468Substation-Adjacent69 kV50 MW3.3 yrs53.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Roundup 37, Musselshell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.