Skip to content
Gridcensus

EC Coal Musselshell County

Greenfield

Musselshell County, Montana · SPP

DC Readiness
56.6
Good / 100

EC Coal Musselshell County is a greenfield datacenter candidate site in Musselshell County, Montana, interconnecting through SPP. It screens at 56.6/100 DC Readiness and a 1.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.10¢/kWh
UtilityNORTHWESTERN ENERGY LLC - (MT)investor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 0.5 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSPP
Queue depth35
Avg queue wait1.1 yrs
Recent queue wait0.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPiConnect Billings Fiber Hotel
IXP distance46.9 mi
Fiber providers2
Fiber coverage92.7%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance427.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerCity Of Roundup
Land contactMusselshell County County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)2.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score88/100
Construction cost index55.8 (avg 100)

Location context

Nearest datacenteriConnect Billings Fiber Hotel
DC distance46.9 mi
Nearest rail14.4 mi
Nearest gas pipeline40.1 mi
Nearest fiber route206.0 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (property_tax_abatement)
Commercial electricity9.55¢/kWh
Industrial electricity9.54¢/kWh
Cooling degree days400
Heating degree days7,600
Land price / acre$1,077

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: New/expanding industry tax abatement available for DC construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Musselshell County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
62
Fiber connectivity12%
29
Energy cost10%
90
Water risk7%
56
Natural hazard6%
88
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
100
Gas pipeline2%
0
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Musselshell County, ranked by DC Readiness.

Sites near EC Coal Musselshell County
SiteTypeVoltageCapacityQueue waitScore
EC Coal Musselshell CountyGreenfield——1.1 yrs61.3
UNKNOWN204182Substation-Adjacent115 kV100 MW3.3 yrs58.7
UNKNOWN204181Substation-Adjacent115 kV100 MW3.3 yrs57.6
TAP208477Substation-Adjacent69 kV50 MW3.3 yrs56.2
UNKNOWN208471Substation-Adjacent69 kV50 MW3.3 yrs55.4
UNKNOWN208465Substation-Adjacent69 kV50 MW3.3 yrs54.7
UNKNOWN208468Substation-Adjacent69 kV50 MW3.3 yrs53.1
UNKNOWN208469Substation-Adjacent69 kV50 MW3.3 yrs53.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Musselshell County, Musselshell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.