Milk River at 48.704, -110.060
Federal ExcessHill County, Montana · WECC
At a glance
Milk River at 48.704, -110.060 is a federal excess datacenter candidate site in Hill County, Montana, scoring 50.5/100 DC Readiness — 96th of 103 scored sites in the county. It sits in the WECC grid region and the HILL COUNTY ELECTRIC COOP, INC service territory, where interconnection has averaged 1.1 years from request to operation.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: New/expanding industry tax abatement available for DC construction.
Site location
Get alerts
Track Milk River
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Milk River at 48.704, -110.060 compare with other sites in Hill County?
Milk River at 48.704, -110.060 ranks 96th of 103 scored candidate sites in Hill County. Its 50.5/100 is roughly in line with the county average of 52.0. It is roughly in line with the Montana average of 54.3 and roughly in line with the national average of 53.2.
Against the Montana average, its strongest sub-score is natural hazard (88 vs 88) and its weakest is power availability (30 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Milk River at 48.704, -110.060 to power, fiber and other datacenters?
3 fiber providers report service at the location in FCC broadband data.
What are the flood, water and hazard risks at Milk River at 48.704, -110.060?
At the county level, FEMA's National Risk Index rates Hill County "Very Low".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Hill County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HAVRE / ASSINNIBOINE | Substation-Adjacent | 230 kV | 300 MW | 1.1 yrs | 61.7 |
| OZ Hill | Greenfield | — | — | 1.1 yrs | 59.2 |
| UNKNOWN208245 | Substation-Adjacent | 115 kV | 100 MW | 1.1 yrs | 57.4 |
| UNKNOWN208249 | Substation-Adjacent | 115 kV | 100 MW | 1.1 yrs | 57.4 |
| RUDYARD | Substation-Adjacent | 115 kV | 100 MW | 1.1 yrs | 57.2 |
| UNKNOWN208202 | Substation-Adjacent | 69 kV | 50 MW | 1.1 yrs | 55.4 |
| SWITCH | Substation-Adjacent | 69 kV | 50 MW | 1.1 yrs | 55.4 |
| UNKNOWN208204 | Substation-Adjacent | 69 kV | 50 MW | 1.1 yrs | 55.4 |
Milk River at 48.704, -110.060: common questions
What is the DC Readiness score of Milk River at 48.704, -110.060?
Milk River at 48.704, -110.060 scores 50.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 96th of 103 scored sites in Hill County. The Hill County average is 52.0 and the Montana average is 54.3.
Which electric utility serves Milk River at 48.704, -110.060?
HILL COUNTY ELECTRIC COOP, INC (not available) holds the retail service territory that contains the site.
What grid region is Milk River at 48.704, -110.060 in?
Milk River at 48.704, -110.060 is in the WECC region. Projects interconnecting there have averaged a 1.1-year wait from queue request to operation.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Milk River at 48.704, -110.060, Hill County, MT”, https://gridcensus.com/datacenter-sites/montana/hill-county/milk-river-0bbfde9c (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Milk River at 48.704, -110.060, Hill County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.