Substation-Adjacent site at 39.125, -94.577

Substation-Adjacent

Wyandotte, Missouri · SPP

DC Readiness
62.7
Good / 100

At a glance

Substation-Adjacent site at 39.125, -94.577 is a substation-adjacent datacenter candidate site in Wyandotte, Missouri, scoring 62.7/100 DC Readiness — 9th of 153 scored sites in the county. Its nearest substation is UNKNOWN117582 (0 mi, 161 kV). It sits in the SPP grid region and the EVERGY MISSOURI WEST service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN117582
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityEVERGY MISSOURI WESTinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPUnReal Servers
IXP distance0.6 mi
Fiber providers9
Fiber coverage91.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterUnReal Servers
DC distance0.6 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$9,876

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN117582

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 39.125, -94.577 compare with other sites in Wyandotte?

Substation-Adjacent site at 39.125, -94.577 ranks 9th of 153 scored candidate sites in Wyandotte. Its 62.7/100 is about 10% above the county average of 56.9. It is about 13% above the Missouri average of 55.7 and about 18% above the national average of 53.2.

Against the Missouri average, its strongest sub-score is fiber connectivity (100 vs 76) and its weakest is water (52 vs 88). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 39.125, -94.577 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN117582, is about 0 miles away and operates at 161 kV. For connectivity, the nearest internet exchange facility is UnReal Servers at 0.6 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is UnReal Servers, 0.6 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 39.125, -94.577?

At the county level, FEMA's National Risk Index rates Wyandotte "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
56
Fiber connectivity12%
100
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Wyandotte, ranked by DC Readiness.

Sites near Substation-Adjacent site at 39.125, -94.577
SiteTypeVoltageCapacityQueue waitScore
EC Near Nearman CreekGreenfield——4.3 yrs65.5
Armour RoadBrownfield161 kV0 MW4.3 yrs65.5
Grand AvenueBrownfield—83 MW4.3 yrs65.0
EC Near Nearman CreekGreenfield——4.3 yrs64.2
EC Near Nearman CreekGreenfield——4.3 yrs64.0
EC Near Nearman CreekGreenfield——4.3 yrs63.4
OZ WyandotteGreenfield——4.3 yrs63.2
UNKNOWN118113Substation-Adjacent161 kV100 MW4.3 yrs63.2

Substation-Adjacent site at 39.125, -94.577: common questions

What is the DC Readiness score of Substation-Adjacent site at 39.125, -94.577?

Substation-Adjacent site at 39.125, -94.577 scores 62.7/100 on the GridCensus DC Readiness scale, rated good. It ranks 9th of 153 scored sites in Wyandotte. The Wyandotte average is 56.9 and the Missouri average is 55.7.

What is the nearest substation to Substation-Adjacent site at 39.125, -94.577?

The nearest mapped substation is UNKNOWN117582, about 0 miles away, at 161 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 39.125, -94.577?

EVERGY MISSOURI WEST (investor owned) holds the retail service territory that contains the site; its holding company is GREAT PLAINS ENERGY.

What grid region is Substation-Adjacent site at 39.125, -94.577 in?

Substation-Adjacent site at 39.125, -94.577 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Substation-Adjacent site at 39.125, -94.577 from an internet exchange?

The nearest internet exchange facility is UnReal Servers, about 0.6 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 39.125, -94.577, Wyandotte, MO”, https://gridcensus.com/datacenter-sites/missouri/wyandotte/unknown117582-5bc5fa4c (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 39.125, -94.577, Wyandotte is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.