Greenfield (ATCHISON - BOONEVILLE)
GreenfieldTaylor County, Missouri · MISO
At a glance
Greenfield (ATCHISON - BOONEVILLE) is a greenfield datacenter candidate site in Taylor County, Missouri, scoring 56.8/100 DC Readiness — 1st of 2 scored sites in the county. Its nearest substation is ATCHISON. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 600 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.
Site location
Get alerts
Track Greenfield (ATCHISON - BOONEVILLE)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Greenfield (ATCHISON - BOONEVILLE) compare with other sites in Taylor County?
Greenfield (ATCHISON - BOONEVILLE) ranks 1st of 2 scored candidate sites in Taylor County. Its 56.8/100 is roughly in line with the county average of 54.0. It is roughly in line with the Missouri average of 55.7 and roughly in line with the national average of 53.2.
Against the Missouri average, its strongest sub-score is power availability (59 vs 37) and its weakest is fiber connectivity (66 vs 76). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Greenfield (ATCHISON - BOONEVILLE) to power, fiber and other datacenters?
The nearest mapped substation, ATCHISON, is the closest grid connection point on record and operates at 345 kV. For connectivity, the nearest internet exchange facility is TierPoint Omaha - Bellevue at 57.7 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Google, 51.1 miles away.
What are the flood, water and hazard risks at Greenfield (ATCHISON - BOONEVILLE)?
At the county level, FEMA's National Risk Index rates Taylor County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Taylor County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (UNKNOWN131420 - UNKNOWN173497) | Greenfield | 161 kV | 100 MW | 4.3 yrs | 51.2 |
Greenfield (ATCHISON - BOONEVILLE): common questions
What is the DC Readiness score of Greenfield (ATCHISON - BOONEVILLE)?
Greenfield (ATCHISON - BOONEVILLE) scores 56.8/100 on the GridCensus DC Readiness scale, rated good. It ranks 1st of 2 scored sites in Taylor County. The Taylor County average is 54.0 and the Missouri average is 55.7.
What is the nearest substation to Greenfield (ATCHISON - BOONEVILLE)?
The nearest mapped substation is ATCHISON, at 345 kV. GridCensus catalogs 600 MW of candidate capacity for the site.
What grid region is Greenfield (ATCHISON - BOONEVILLE) in?
Greenfield (ATCHISON - BOONEVILLE) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Greenfield (ATCHISON - BOONEVILLE) from an internet exchange?
The nearest internet exchange facility is TierPoint Omaha - Bellevue, about 57.7 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield (ATCHISON - BOONEVILLE), Taylor County, MO”, https://gridcensus.com/datacenter-sites/missouri/taylor-county/greenfield-atchison-booneville-706e9493 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Greenfield (ATCHISON - BOONEVILLE), Taylor County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.