Ripley County, Missouri · PJM

DC Readiness
40.8
Fair / 100

Jonesboro is a federal excess datacenter candidate site in Ripley County, Missouri, interconnecting through PJM. It screens at 40.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth11

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance109.6 mi
Fiber providers3
Max download15 Mbps

Site characteristics

Acreage9 ac
Former usePower Development and Distribution

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterSearcy Information Technologies
DC distance108.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.16¢/kWh
Industrial electricity8.74¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$2,855

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
41
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Ripley County, ranked by DC Readiness.

Sites near Jonesboro
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117758Substation-Adjacent161 kV100 MW1.4 yrs62.7
Greenfield (UNKNOWN117769 - UNKNOWN122781)Greenfield345 kV600 MW4.6 yrs58.5
Greenfield (UNKNOWN117922 - UNKNOWN122781)Greenfield161 kV100 MW1.4 yrs57.7
OZ RipleyGreenfield1.4 yrs57.1
Greenfield (UNKNOWN117922 - UNKNOWN122781)Greenfield161 kV100 MW1.4 yrs56.5
Greenfield (UNKNOWN117922 - UNKNOWN122781)Greenfield161 kV100 MW1.4 yrs55.8
Greenfield (UNKNOWN117922 - UNKNOWN122781)Greenfield161 kV100 MW1.4 yrs55.4
Greenfield (UNKNOWN107787 - UNKNOWN117758)Greenfield161 kV100 MW1.4 yrs55.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Jonesboro, Ripley County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.