Jonesboro at 38.436, -91.511

Federal Excess

Gasconade County, Missouri · MISO

DC Readiness
48.9
Fair / 100

At a glance

Jonesboro at 38.436, -91.511 is a federal excess datacenter candidate site in Gasconade County, Missouri, scoring 48.9/100 DC Readiness — 25th of 26 scored sites in the county. It sits in the MISO grid region and the UNION ELECTRIC CO - (MO) service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth52
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance62.1 mi
Fiber providers6
Fiber coverage41.5%
Max download37 Mbps

Site characteristics

Acreage11 ac
Buildable load (est.)~4–11 MWland-based
Former usePower Development and Distribution

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterCarfax
DC distance53.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.50¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,826

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Jonesboro

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Jonesboro at 38.436, -91.511 compare with other sites in Gasconade County?

Jonesboro at 38.436, -91.511 ranks 25th of 26 scored candidate sites in Gasconade County. Its 48.9/100 is roughly in line with the county average of 51.9. It is about 12% below the Missouri average of 55.7 and roughly in line with the national average of 53.2.

Against the Missouri average, its strongest sub-score is natural hazard (62 vs 61) and its weakest is fiber connectivity (57 vs 76). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Jonesboro at 38.436, -91.511 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is TierPoint St. Louis – Millpark at 62.1 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Carfax, 53.8 miles away.

What are the flood, water and hazard risks at Jonesboro at 38.436, -91.511?

At the county level, FEMA's National Risk Index rates Gasconade County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Gasconade County, ranked by DC Readiness.

Sites near Jonesboro at 38.436, -91.511
SiteTypeVoltageCapacityQueue waitScore
BLANDSubstation-Adjacent345 kV600 MW4.3 yrs61.8
EC Coal Gasconade CountyGreenfield——4.3 yrs57.8
UNKNOWN117731Substation-Adjacent161 kV100 MW4.3 yrs56.3
UNKNOWN117780Substation-Adjacent138 kV100 MW4.3 yrs55.9
UNKNOWN117921Substation-Adjacent138 kV100 MW4.3 yrs55.7
UNKNOWN117717Substation-Adjacent69 kV50 MW4.3 yrs53.6
TAP140564Substation-Adjacent69 kV50 MW4.3 yrs53.5
UNKNOWN117915Substation-Adjacent69 kV50 MW4.3 yrs53.4

Jonesboro at 38.436, -91.511: common questions

What is the DC Readiness score of Jonesboro at 38.436, -91.511?

Jonesboro at 38.436, -91.511 scores 48.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 25th of 26 scored sites in Gasconade County. The Gasconade County average is 51.9 and the Missouri average is 55.7.

Which electric utility serves Jonesboro at 38.436, -91.511?

UNION ELECTRIC CO - (MO) (investor owned) holds the retail service territory that contains the site; its holding company is AMEREN CORP.

What grid region is Jonesboro at 38.436, -91.511 in?

Jonesboro at 38.436, -91.511 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Jonesboro at 38.436, -91.511 from an internet exchange?

The nearest internet exchange facility is TierPoint St. Louis – Millpark, about 62.1 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Jonesboro at 38.436, -91.511, Gasconade County, MO”, https://gridcensus.com/datacenter-sites/missouri/gasconade-county/jonesboro-59a66368 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Jonesboro at 38.436, -91.511, Gasconade County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.