Substation-Adjacent site at 38.986, -92.290

Substation-Adjacent

Boone, Missouri · MISO

DC Readiness
56.9
Good / 100

At a glance

Substation-Adjacent site at 38.986, -92.290 is a substation-adjacent datacenter candidate site in Boone, Missouri, scoring 56.9/100 DC Readiness — 26th of 49 scored sites in the county. Its nearest substation is UNKNOWN121125 (0 mi, 69 kV). It sits in the MISO grid region and the UNION ELECTRIC CO - (MO) service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN121125
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth52
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance103.0 mi
Fiber providers11
Fiber coverage93.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterCarfax
DC distance4.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.91¢/kWh
Industrial electricity9.14¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,608

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN121125

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 38.986, -92.290 compare with other sites in Boone?

Substation-Adjacent site at 38.986, -92.290 ranks 26th of 49 scored candidate sites in Boone. Its 56.9/100 is roughly in line with the county average of 56.7. It is roughly in line with the Missouri average of 55.7 and roughly in line with the national average of 53.2.

Against the Missouri average, its strongest sub-score is power availability (46 vs 37) and its weakest is speed to power (49 vs 53). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 38.986, -92.290 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN121125, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is TierPoint St. Louis – Millpark at 103 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Carfax, 4.3 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 38.986, -92.290?

At the county level, FEMA's National Risk Index rates Boone "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
49
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Boone, ranked by DC Readiness.

Sites near Substation-Adjacent site at 38.986, -92.290
SiteTypeVoltageCapacityQueue waitScore
EC Near Columbia (MO)Greenfield——4.3 yrs61.6
EC Near Columbia (MO)Greenfield——4.3 yrs61.5
EC Near Columbia (MO)Greenfield——4.3 yrs61.5
EC Coal Boone CountyGreenfield——4.3 yrs61.2
EC Near Columbia (MO)Greenfield——4.3 yrs60.7
UNKNOWN117881Substation-Adjacent161 kV100 MW4.3 yrs60.3
EC Near Columbia (MO)Greenfield——4.3 yrs60.1
UNKNOWN117071Substation-Adjacent161 kV100 MW4.3 yrs59.6

Substation-Adjacent site at 38.986, -92.290: common questions

What is the DC Readiness score of Substation-Adjacent site at 38.986, -92.290?

Substation-Adjacent site at 38.986, -92.290 scores 56.9/100 on the GridCensus DC Readiness scale, rated good. It ranks 26th of 49 scored sites in Boone. The Boone average is 56.7 and the Missouri average is 55.7.

What is the nearest substation to Substation-Adjacent site at 38.986, -92.290?

The nearest mapped substation is UNKNOWN121125, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 38.986, -92.290?

UNION ELECTRIC CO - (MO) (investor owned) holds the retail service territory that contains the site; its holding company is AMEREN CORP.

What grid region is Substation-Adjacent site at 38.986, -92.290 in?

Substation-Adjacent site at 38.986, -92.290 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Substation-Adjacent site at 38.986, -92.290 from an internet exchange?

The nearest internet exchange facility is TierPoint St. Louis – Millpark, about 103 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 38.986, -92.290, Boone, MO”, https://gridcensus.com/datacenter-sites/missouri/boone/unknown121125-d99ec1cb (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 38.986, -92.290, Boone is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.