Skip to content
Gridcensus

EC Coal Boone County

Greenfield

Boone, Missouri · MISO

DC Readiness
61.8
Good / 100

EC Coal Boone County is a greenfield datacenter candidate site in Boone, Missouri, interconnecting through MISO. It screens at 61.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance106.0 mi
Fiber providers11
Fiber coverage93.8%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance205.5 mi

Site characteristics

Site typeGreenfield
Land contactBoone County County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usecoal adjacent

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSINCLAIR STA 24004
Hazard sub-score52/100
Construction cost index89.4 (avg 100)

Location context

Nearest datacenterCarfax
DC distance4.2 mi
Nearest rail1.5 mi
Nearest gas pipeline7.0 mi
Nearest fiber route120.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.91¢/kWh
Industrial electricity9.14¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,608

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Boone County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
74
Energy cost10%
89
Water risk7%
88
Natural hazard6%
52
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
76
Gas pipeline2%
78
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Boone, ranked by DC Readiness.

Sites near EC Coal Boone County
SiteTypeVoltageCapacityQueue waitScore
EC Near Columbia (MO)Greenfield1.4 yrs62.2
EC Near Columbia (MO)Greenfield1.4 yrs62.1
EC Near Columbia (MO)Greenfield1.4 yrs62.1
EC Near Columbia (MO)Greenfield1.4 yrs61.3
EC Near Columbia (MO)Greenfield1.4 yrs60.7
EC Near Columbia (MO)Greenfield1.4 yrs59.9
MU Combined Heat and Power PlantBrownfield6 MW1.4 yrs59.8
UNKNOWN117881Substation-Adjacent161 kV100 MW2.8 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Boone County, Boone. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.