Datacenter Sites in TATE, Mississippi
TATE has 17 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
17
Candidate sites
56.2/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for TATE
Yessales_tax_exemption
Datacenter tax incentive
11.95¢/kWh
Commercial electricity
7.15¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,310
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in TATE
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| COLDWATER | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.2 |
| OZ Tate | Greenfield | — | — | 1.4 yrs | 55.9 |
| BLUE GOOSE | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.4 |
| UNKNOWN111329 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 55.0 |
| UNKNOWN111289 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.4 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 52.1 |
| CHROMCRAFT CORP. (METAL HOUSEHOLD FURNITURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.9 |
| CARLISLE SYNTEC, INC. (ASPHALT SHINGLE AND COATING MATERIALS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.8 |
| BADDOUR CENTER, THE (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| ALUMINUM EXTRUSIONS, INC. (OTHER ALUMINUM ROLLING AND DRAWING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| R. R. DONNELLEY & SONS CO. (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 51.2 |
| ADVANCED URETHANE TECHNOLOGIES (URETHANE AND OTHER FOAM PRODUCT (EXCEPT POLYSTYRENE) MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.2 |
| GOLDEN TIMBER CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 51.0 |
TATE datacenter FAQ
- How many datacenter sites are in TATE?
- 17 scored datacenter candidate sites, averaging 56.2/100 DC Readiness.
- Does TATE offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in TATE?
- FEMA's National Risk Index rates TATE as "Relatively High" (score 45).
- What are industrial electricity rates in TATE?
- Average industrial electricity is 7.15¢/kWh and commercial is 11.95¢/kWh in TATE.
Dataset updated . Screening estimates derived from public data sources.