Datacenter Sites in TATE, Mississippi

TATE has 17 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

17
Candidate sites
53.8/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for TATE

Yessales_tax_exemption
Datacenter tax incentive
11.95¢/kWh
Commercial electricity
7.15¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,310
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in TATE

Top datacenter sites in TATE
SiteTypeVoltageCapacityQueue waitScore
COLDWATERSubstation-Adjacent115 kV100 MW1.4 yrs67.0
UNKNOWN111329Substation-Adjacent115 kV100 MW1.4 yrs65.4
HERNANDOSubstation-Adjacent115 kV100 MW1.4 yrs64.4
BLUE GOOSESubstation-Adjacent161 kV100 MW1.4 yrs64.0
TAP154296Substation-Adjacent115 kV100 MW1.4 yrs59.5
Greenfield (UNKNOWN111329 - N. SARDIS)Greenfield115 kV100 MW1.4 yrs57.8
Greenfield (BATEVILLE - BLUE GOOSE)Greenfield161 kV100 MW1.4 yrs57.7
OZ TateGreenfield1.4 yrs55.0
ADVANCED URETHANE TECHNOLOGIES (URETHANE AND OTHER FOAM PRODUCT (EXCEPT POLYSTYRENE) MANUFACTURING)Manufacturing48.9
CHROMCRAFT CORP. (METAL HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing47.9
ALUMINUM EXTRUSIONS, INC. (OTHER ALUMINUM ROLLING AND DRAWING)Manufacturing47.7
R. R. DONNELLEY & SONS CO. (OTHER COMMERCIAL PRINTING)Manufacturing47.7
GOLDEN TIMBER CO., INC. (NOT AVAILABLE)Manufacturing47.6
CARLISLE SYNTEC, INC. (ASPHALT SHINGLE AND COATING MATERIALS MANUFACTURING)Manufacturing47.6
BADDOUR CENTER, THE (NOT AVAILABLE)Manufacturing47.5
Mine SiteFormer Mine44.8
Mine SiteFormer Mine44.0

TATE datacenter FAQ

How many datacenter sites are in TATE?
17 scored datacenter candidate sites, averaging 53.8/100 DC Readiness.
Does TATE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in TATE?
FEMA's National Risk Index rates TATE as "Relatively High" (score 45).
What are industrial electricity rates in TATE?
Average industrial electricity is 7.15¢/kWh and commercial is 11.95¢/kWh in TATE.

Dataset updated . Screening estimates derived from public data sources.