GOLDEN TIMBER CO., INC. (NOT AVAILABLE)

Manufacturing

TATE, Mississippi

DC Readiness
51.0
Fair / 100

GOLDEN TIMBER CO., INC. (NOT AVAILABLE) is a manufacturing datacenter candidate site in TATE, Mississippi. It screens at 51.0/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Avg queue wait3.5 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance29.1 mi
Fiber providers4
Fiber coverage76.2%

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterLevel(3) Memphis
DC distance29.1 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.95¢/kWh
Industrial electricity7.15¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,310

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
66
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in TATE, ranked by DC Readiness.

Sites near GOLDEN TIMBER CO., INC. (NOT AVAILABLE)
SiteTypeVoltageCapacityQueue waitScore
COLDWATERSubstation-Adjacent115 kV100 MW2.8 yrs56.2
OZ TateGreenfield1.4 yrs55.9
BLUE GOOSESubstation-Adjacent161 kV100 MW2.8 yrs55.4
UNKNOWN111329Substation-Adjacent115 kV100 MW2.8 yrs55.0
UNKNOWN111289Substation-Adjacent161 kV100 MW2.8 yrs54.4
Mine SiteFormer Mine2.8 yrs52.1
CHROMCRAFT CORP. (METAL HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing3.5 yrs51.9
CARLISLE SYNTEC, INC. (ASPHALT SHINGLE AND COATING MATERIALS MANUFACTURING)Manufacturing3.5 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GOLDEN TIMBER CO., INC. (NOT AVAILABLE), TATE. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.