SMALL FRUIT RESEARCH STATION

Federal Excess

STONE, Mississippi · PJM

DC Readiness
49.8
Fair / 100

SMALL FRUIT RESEARCH STATION is a federal excess datacenter candidate site in STONE, Mississippi, interconnecting through PJM. It screens at 49.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityMISSISSIPPI POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEdgeConneX New Orleans (EDCSLI01)
IXP distance56.3 mi
Fiber providers8
Fiber coverage81.9%
Max download20 Mbps

Site characteristics

Acreage40 ac
Buildable load (est.)~16–40 MWland-based
Former useAgriculture

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterEdgeConneX New Orleans (EDCSLI01)
DC distance56.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,998

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SMALL FRUIT RESEARCH STATION

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in STONE, ranked by DC Readiness.

Sites near SMALL FRUIT RESEARCH STATION
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110237Substation-Adjacent230 kV300 MW2.8 yrs58.2
UNKNOWN110238Substation-Adjacent115 kV100 MW2.8 yrs54.6
TAP143370Substation-Adjacent115 kV100 MW2.8 yrs54.5
UNKNOWN110240Substation-Adjacent115 kV100 MW2.8 yrs54.4
CELLU TISSUE-COSTAL PAPER (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.1
HOOD INDUSTRIES, INC. (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing——3.5 yrs51.1
A & D TIMBER CO., INC. (LOGGING)Manufacturing——3.5 yrs51.1
CARPENTER'S POLE & PILING (NOT AVAILABLE)Manufacturing——3.5 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for SMALL FRUIT RESEARCH STATION, STONE is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.