Datacenter Sites in STONE, Mississippi

STONE has 23 scored datacenter candidate sites averaging 55.2/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

23
Candidate sites
55.2/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 19 in STONE

Site-selection context for STONE

Yessales_tax_exemption
Datacenter tax incentive
11.87¢/kWh
Commercial electricity
8.44¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$3,998
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in STONE

Top datacenter sites in STONE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110237Substation-Adjacent230 kV300 MW2.8 yrs58.4
UNKNOWN110238Substation-Adjacent115 kV100 MW2.8 yrs54.0
TAP143370Substation-Adjacent115 kV100 MW2.8 yrs54.0
UNKNOWN110240Substation-Adjacent115 kV100 MW2.8 yrs54.0
Mine SiteFormer Mine2.8 yrs51.6
Mine SiteFormer Mine2.8 yrs51.4
BALDWIN POLE MS, LLC (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing3.5 yrs51.1
CELLU TISSUE-COSTAL PAPER (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing3.5 yrs51.1
A & D TIMBER CO., INC. (LOGGING)Manufacturing3.5 yrs51.1
CARPENTER'S POLE & PILING (NOT AVAILABLE)Manufacturing3.5 yrs51.1
HOOD INDUSTRIES, INC. (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing3.5 yrs51.1
ATCO RUBBER PRODUCTS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs51.0
OWEN LOGGING CO., INC. (LOGGING)Manufacturing3.5 yrs51.0
DESOTO TREATED MATERIALS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs51.0
GENERAL DYNAMICS ORNAMENTALS (SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING)Manufacturing3.5 yrs50.9
B & T CUSTOM WOODWORKS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing3.5 yrs50.9
SMALL FRUIT RESEARCH STATIONFederal Excess3.8 yrs49.8
Greenfield (TAP143374 - TAP169506)Greenfield115 kV100 MW2.8 yrs47.7
Greenfield (UNKNOWN110302 - TAP169506)Greenfield115 kV100 MW2.8 yrs47.7

STONE datacenter FAQ

How many datacenter sites are in STONE?
23 scored datacenter candidate sites, averaging 55.2/100 DC Readiness.
Does STONE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in STONE?
FEMA's National Risk Index rates STONE as "Relatively High" (score 45).
What are industrial electricity rates in STONE?
Average industrial electricity is 8.44¢/kWh and commercial is 11.87¢/kWh in STONE.

Dataset updated . Screening estimates derived from public data sources.