SMALL FRUIT RESEARCH STATION
Federal ExcessPEARL RIVER, Mississippi · PJM
SMALL FRUIT RESEARCH STATION is a federal excess datacenter candidate site in PEARL RIVER, Mississippi, interconnecting through PJM. It screens at 50.5/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in PEARL RIVER, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN110001 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 60.7 |
| UNKNOWN109999 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 57.0 |
| TAP143432 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.6 |
| UNKNOWN112451 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 56.4 |
| TAP143431 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.0 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.2 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.2 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SMALL FRUIT RESEARCH STATION, PEARL RIVER. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.