PEARL RIVER has 49 scored datacenter candidate sites averaging 56.5/100 DC Readiness, with a catalogued aggregate of 5,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

49
Candidate sites
56.5/100
Avg DC Readiness
5,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in PEARL RIVER

Site-selection context for PEARL RIVER

Yessales_tax_exemption
Datacenter tax incentive
11.79¢/kWh
Commercial electricity
7.44¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$3,891
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in PEARL RIVER

Top datacenter sites in PEARL RIVER
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110001Substation-Adjacent230 kV300 MW2.8 yrs60.7
UNKNOWN109999Substation-Adjacent115 kV100 MW2.8 yrs57.0
TAP143432Substation-Adjacent115 kV100 MW2.8 yrs56.6
UNKNOWN112451Substation-Adjacent230 kV300 MW2.8 yrs56.4
TAP143431Substation-Adjacent115 kV100 MW2.8 yrs56.0
Mine SiteFormer Mine2.8 yrs55.2
Mine SiteFormer Mine2.8 yrs55.2
Mine SiteFormer Mine2.8 yrs55.1
Mine SiteFormer Mine2.8 yrs54.9
ST. TAMMANY BOX CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing3.5 yrs54.3
RHEOGISTICS, LLC (PLASTICS MATERIAL AND RESIN MANUFACTURING)Manufacturing3.5 yrs54.3
TAP143368Substation-Adjacent115 kV100 MW2.8 yrs54.2
HSI READY MIX, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs54.2
TAP143428Substation-Adjacent115 kV100 MW2.8 yrs54.2
UNKNOWN109994Substation-Adjacent115 kV100 MW2.8 yrs54.2
UNKNOWN110236Substation-Adjacent115 kV100 MW2.8 yrs54.2
STOCKSTILL, INC., HUEY (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.2
UNKNOWN109993Substation-Adjacent115 kV100 MW2.8 yrs54.2
UNKNOWN109996Substation-Adjacent115 kV100 MW2.8 yrs54.2
UNKNOWN109992Substation-Adjacent115 kV100 MW2.8 yrs54.2
Mine SiteFormer Mine2.8 yrs54.1
TWI CHEMICAL DISTRIBUTORS (ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING)Manufacturing3.5 yrs53.5
AVON ENGINEER FABRICATION, INC. (METAL TANK (HEAVY GAUGE) MANUFACTURING)Manufacturing3.5 yrs53.5
WAY, INC., THE (POLISH AND OTHER SANITATION GOOD MANUFACTURING)Manufacturing3.5 yrs53.5
HERITAGE PLASTICS, INC. (CUSTOM COMPOUNDING OF PURCHASED RESINS)Manufacturing3.5 yrs53.5

PEARL RIVER datacenter FAQ

How many datacenter sites are in PEARL RIVER?
49 scored datacenter candidate sites, averaging 56.5/100 DC Readiness.
Does PEARL RIVER offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in PEARL RIVER?
FEMA's National Risk Index rates PEARL RIVER as "Relatively High" (score 45).
What are industrial electricity rates in PEARL RIVER?
Average industrial electricity is 7.44¢/kWh and commercial is 11.79¢/kWh in PEARL RIVER.