Datacenter Sites in PEARL RIVER, Mississippi
PEARL RIVER has 49 scored datacenter candidate sites averaging 56.5/100 DC Readiness, with a catalogued aggregate of 5,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
49
Candidate sites
56.5/100
Avg DC Readiness
5,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for PEARL RIVER
Yessales_tax_exemption
Datacenter tax incentive
11.79¢/kWh
Commercial electricity
7.44¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$3,891
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in PEARL RIVER
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN110001 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 60.7 |
| UNKNOWN109999 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 57.0 |
| TAP143432 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.6 |
| UNKNOWN112451 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 56.4 |
| TAP143431 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 56.0 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.2 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.2 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 55.1 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 54.9 |
| ST. TAMMANY BOX CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.3 |
| RHEOGISTICS, LLC (PLASTICS MATERIAL AND RESIN MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.3 |
| TAP143368 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| HSI READY MIX, INC. (READY-MIX CONCRETE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| TAP143428 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN109994 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN110236 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| STOCKSTILL, INC., HUEY (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| UNKNOWN109993 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN109996 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN109992 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 54.1 |
| TWI CHEMICAL DISTRIBUTORS (ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| AVON ENGINEER FABRICATION, INC. (METAL TANK (HEAVY GAUGE) MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| WAY, INC., THE (POLISH AND OTHER SANITATION GOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| HERITAGE PLASTICS, INC. (CUSTOM COMPOUNDING OF PURCHASED RESINS) | Manufacturing | — | — | 3.5 yrs | 53.5 |
PEARL RIVER datacenter FAQ
- How many datacenter sites are in PEARL RIVER?
- 49 scored datacenter candidate sites, averaging 56.5/100 DC Readiness.
- Does PEARL RIVER offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in PEARL RIVER?
- FEMA's National Risk Index rates PEARL RIVER as "Relatively High" (score 45).
- What are industrial electricity rates in PEARL RIVER?
- Average industrial electricity is 7.44¢/kWh and commercial is 11.79¢/kWh in PEARL RIVER.
Dataset updated . Screening estimates derived from public data sources.